Catalogue Search | MBRL
Search Results Heading
Explore the vast range of titles available.
MBRLSearchResults
-
DisciplineDiscipline
-
Is Peer ReviewedIs Peer Reviewed
-
Reading LevelReading Level
-
Content TypeContent Type
-
YearFrom:-To:
-
More FiltersMore FiltersItem TypeIs Full-Text AvailableSubjectCountry Of PublicationPublisherSourceTarget AudienceDonorLanguagePlace of PublicationContributorsLocation
Done
Filters
Reset
1,385
result(s) for
"إدارة المشروع"
Sort by:
النشاط المدرسي بين النظرية والتطبيق العملي
يحتوي هذا الكتاب \"النشاط المدرسي بين النظرية والتطبيق العملي\" علي عدة فصول تشمل النشاط المدرسي ومفهومه وتطوره وأهميته ويتناول أيضا وظائفه في ضوء المفهوم الشامل للمنهج وأهداف النشاط المدرسي ومجالات النشاط المدرسي والنشاط المدرسي في المراحل التعليمية المختلفة ومجالس الآباء والمعلمين والنشاط المدرسي والاعلام التربوي وإدارة وتقويم برامج النشاط المدرسي.
Application of Earned Value Management to Compute the Project Performance Using Analytical Network Process
2016
Every project confronts risk both in financial and technical dimensions. This induces a greater response on the performance of the project. A successful construction project depends on how the project participants compute the actual project performance. A commendable assessment of project performance practice determines the project productivity both quantitatively and qualitatively. Methods of project performance measurement vary among industries. As a contribution to the above, this study equips the project manager with a proficient mode of project performance measurement and the essential promising decisions that head to profit maximization. This intricate study thus facilitates the project manager to compute the project performance on the basis of the effects of Earned Value Management (EVM) indices which are broadly classified as: variance indices, performance indices and miscellaneous or forecast indices. Adopting the Analytical Network Process (ANP) structure model in Super Decision software is a reliable decision making tool. This study indicates that the cost variance (CV) index is prominent among the EVM indices that highly affect the project characteristics, the measurement of which facilitates the required control measures on respective project activities. It also indicates that cost is the major project characteristic, the variation of which immensely affects the project performance. It procures an objective reference for engineering projects by following the selection process of best EVM indices that holds an accurate measure of project performance.
Journal Article