MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey
Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey
Journal Article

Multi-criteria of wind-solar site selection problem using a GIS-AHP-based approach with an application in Igdir Province/Turkey

2019
Request Book From Autostore and Choose the Collection Method
Overview
Sustainable sources like wind, solar, and geothermal power are defined as a clean source of renewable energy which has a less harmful impact on the environment than other energy sources such as coal, natural gas and oil. Turkey is one of the energy-importing countries where air pollution has been become an inevitable environmental concern. Thus, investments on sustainable sources have been developed rapidly in recent years in Turkey. This paves the way for studying a site selection problem considering both solar and wind energy in Igdir Province located in the east part of Turkey. In the literature, there are many studies on solar-wind energy to select a desirable site for both energy sources, and many solution techniques have been proposed dealing with this problem. In this study, one of multi-criteria decision-making methods named analytical hierarchy process (AHP) and geographical information systems (GIS) are used to determine suitable site selection for solar-wind energy investigating four counties of Igdir: Tuzluca, Igdir Central, Karakoyunlu and Aralik. The aim of this work is first to investigate possible locations for solar-wind power plant installation using a mapping method, GIS, and then, AHP is applied to the problem to obtain optimum areas for both solar-wind energy. Also, more accurate results are provided comparing results of two methods, GIS and AHP. The results reveal that 524.5 km 2 for solar power plant and 147.2 km 2 for wind turbine are suitable while only 49.1 km 2 is suitable for solar-wind power plan installation.