Search Results Heading

MBRLSearchResults

mbrl.module.common.modules.added.book.to.shelf
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
    Done
    Filters
    Reset
  • Discipline
      Discipline
      Clear All
      Discipline
  • Is Peer Reviewed
      Is Peer Reviewed
      Clear All
      Is Peer Reviewed
  • Item Type
      Item Type
      Clear All
      Item Type
  • Subject
      Subject
      Clear All
      Subject
  • Year
      Year
      Clear All
      From:
      -
      To:
  • More Filters
9 result(s) for "B. Tuchming"
Sort by:
Compatibility and combination of world W-boson mass measurements
The compatibility of W -boson mass measurements performed by the ATLAS, LHCb, CDF, and D0 experiments is studied using a coherent framework with theory uncertainty correlations. The measurements are combined using a number of recent sets of parton distribution functions (PDF), and are further combined with the average value of measurements from the Large Electron–Positron collider. The considered PDF sets generally have a low compatibility with a suite of global rapidity-sensitive Drell–Yan measurements. The most compatible set is CT18 due to its larger uncertainties. A combination of all m W measurements yields a value of m W = 80 , 394.6 ± 11.5  MeV with the CT18 set, but has a probability of compatibility of 0.5% and is therefore disfavoured. Combinations are performed removing each measurement individually, and a 91% probability of compatibility is obtained when the CDF measurement is removed. The corresponding value of the W boson mass is 80 , 369.2 ± 13.3  MeV, which differs by 3.6 σ from the CDF value determined using the same PDF set.
Production of antihydrogen atoms by 6 keV antiprotons through a positronium cloud
We report on the first production of an antihydrogen beam by charge exchange of 6.1 keV antiprotons with a cloud of positronium in the GBAR experiment at CERN. The 100 keV antiproton beam delivered by the AD/ELENA facility was further decelerated with a pulsed drift tube. A 9 MeV electron beam from a linear accelerator produced a low energy positron beam. The positrons were accumulated in a set of two Penning–Malmberg traps. The positronium target cloud resulted from the conversion of the positrons extracted from the traps. The antiproton beam was steered onto this positronium cloud to produce the antiatoms. We observe an excess over background indicating antihydrogen production with a significance of 3–4 standard deviations.
Erratum to: Production of antihydrogen atoms by 6 keV antiprotons through a positronium cloud
We report on the first production of an antihydrogen beam by charge exchange of 6.1 keV antiprotons with a cloud of positronium in the GBAR experiment at CERN. The 100 keV antiproton beam delivered by the AD/ELENA facility was further decelerated with a pulsed drift tube. A 9 MeV electron beam from a linear accelerator produced a low energy positron beam. The positrons were accumulated in a set of two Penning–Malmberg traps. The positronium target cloud resulted from the conversion of the positrons extracted from the traps. The antiproton beam was steered onto this positronium cloud to produce the antiatoms. We observe an excess over background indicating antihydrogen production with a significance of 3–4 standard deviations.
News from the GBAR experiment: Improved positron accumulation in a buffer gas trap with a silicon carbide remoderator
The aim of the GBAR experiment is to measure the gravitational acceleration of antihydrogen by observing the free fall of ultracold anti-atoms. The experiment is installed at CERN’s Antiproton Decelerator/ELENA facility. Positrons are produced by a low energy (9 MeV) linear electron accelerator and captured in a modified Surko (buffer gas) trap. We have recently implemented a silicon carbide-based trapping scheme that replaces the routinely used nitrogen gas with a high quality silicon carbide single crystal in the first phase of the trap. The new setup has been providing stable and efficient positron trapping for more than a year. After a short accumulation in the buffer gas trap, the particles are transported to a high-field (5 T) Penning-Malmberg trap, where a high number of pulses can be collected in a deep potential well. We discuss the performance of the improved positron line and the present status of the experiment.
Production of antihydrogen atoms by 6 keV antiprotons through a positronium cloud
We report on the first production of an antihydrogen beam by charge exchange of 6.1 keV antiprotons with a cloud of positronium in the GBAR experiment at CERN. The antiproton beam was delivered by the AD/ELENA facility. The positronium target was produced from a positron beam itself obtained from an electron linear accelerator. We observe an excess over background indicating antihydrogen production with a significance of 3-4 standard deviations.
Record accumulation of antiprotons in a Penning-Malmberg Trap and their preparation for improved production of antihydrogen beams
CERN's AD/ELENA ``antimatter factory'' - unique worldwide - serves several experiments, all of which use electromagnetic traps to accumulate antiprotons for fundamental science. The GBAR experiment employs a charge-exchange reaction between an antiproton beam and a positronium cloud to produce antihydrogen for gravitational studies. GBAR has also pioneered an electrostatic scheme using a pulsed drift tube to decelerate the 100 keV antiproton beam, rather than slowing the antiprotons in a foil, as is commonly done in other experiments. Following first results producing a 6 keV antihydrogen beam directly after the decelerator, a trap has now been installed to increase the production rate. The emittance growth resulting from the deceleration is reduced in the trap by Coulomb interaction with a cold electron cloud. The antiproton cloud is further compressed using rotating wall cooling and can be re-accelerated up to energies of 10 keV, including a time focus. Here we describe the commissioning results, trapping 56(3)\\% of the ELENA beam, delivering \\(6.4(0.4)~~10^6\\) antiprotons per shot for improved production of antihydrogen, and a record accumulation of over \\(6.4(0.4)~~10^7\\) antiprotons in under 35 minutes.
Positron accumulation in the GBAR experiment
We present a description of the GBAR positron (e+) trapping apparatus, which consists of a three stage Buffer Gas Trap (BGT) followed by a High Field Penning Trap (HFT), and discuss its performance. The overall goal of the GBAR experiment is to measure the acceleration of the neutral antihydrogen (H) atom in the terrestrial gravitational field by neutralising a positive antihydrogen ion (H+), which has been cooled to a low temperature, and observing the subsequent H annihilation following free fall. To produce one H+ ion, about 10^10 positrons, efficiently converted into positronium (Ps), together with about 10^7 antiprotons (p), are required. The positrons, produced from an electron linac-based system, are accumulated first in the BGT whereafter they are stacked in the ultra-high vacuum HFT, where we have been able to trap 1.4(2) x 10^9 positrons in 1100 seconds.
Positron production using a 9 MeV electron linac for the GBAR experiment
For the GBAR (Gravitational Behaviour of Antihydrogen at Rest) experiment at CERN's Antiproton Decelerator (AD) facility we have constructed a source of slow positrons, which uses a low-energy electron linear accelerator (linac). The driver linac produces electrons of 9 MeV kinetic energy that create positrons from bremsstrahlung-induced pair production. Staying below 10 MeV ensures no persistent radioactive activation in the target zone and that the radiation level outside the biological shield is safe for public access. An annealed tungsten-mesh assembly placed directly behind the target acts as a positron moderator. The system produces \\(510^7\\) slow positrons per second, a performance demonstrating that a low-energy electron linac is a superior choice over positron-emitting radioactive sources for high positron flux.