Catalogue Search | MBRL
Search Results Heading
Explore the vast range of titles available.
MBRLSearchResults
-
DisciplineDiscipline
-
Is Peer ReviewedIs Peer Reviewed
-
Item TypeItem Type
-
SubjectSubject
-
YearFrom:-To:
-
More FiltersMore FiltersSourceLanguage
Done
Filters
Reset
56
result(s) for
"Fields, M Jason"
Sort by:
An overview of wind-energy-production prediction bias, losses, and uncertainties
2021
The financing of a wind farm directly relates to the preconstruction energy yield assessments which estimate the annual energy production for the farm. The accuracy and the precision of the preconstruction energy estimates can dictate the profitability of the wind project. Historically, the wind industry tended to overpredict the annual energy production of wind farms. Experts have been dedicated to eliminating such prediction errors in the past decade, and recently the reported average energy prediction bias is declining. Herein, we present a literature review of the energy yield assessment errors across the global wind energy industry. We identify a long-term trend of reduction in the overprediction bias, whereas the uncertainty associated with the prediction error is prominent. We also summarize the recent advancements of the wind resource assessment process that justify the bias reduction, including improvements in modeling and measurement techniques. Additionally, because the energy losses and uncertainties substantially influence the prediction error, we document and examine the estimated and observed loss and uncertainty values from the literature, according to the proposed framework in the International Electrotechnical Commission 61400-15 wind resource assessment standard. From our findings, we highlight opportunities for the industry to move forward, such as the validation and reduction of prediction uncertainty and the prevention of energy losses caused by wake effect and environmental events. Overall, this study provides a summary of how the wind energy industry has been quantifying and reducing prediction errors, energy losses, and production uncertainties. Finally, for this work to be as reproducible as possible, we include all of the data used in the analysis in appendices to the article.
Journal Article
Assessing variability of wind speed: comparison and validation of 27 methodologies
by
Lee, Joseph C Y
,
Lundquist, Julie K
,
Fields, M Jason
in
Spatial distribution
,
Variability
,
Wind farms
2018
Because wind resources vary from year to year, the intermonthly and interannual variability (IAV) of wind speed is a key component of the overall uncertainty in the wind resource assessment process, thereby creating challenges for wind farm operators and owners. We present a critical assessment of several common approaches for calculating variability by applying each of the methods to the same 37-year monthly wind-speed and energy-production time series to highlight the differences between these methods. We then assess the accuracy of the variability calculations by correlating the wind-speed variability estimates to the variabilities of actual wind farm energy production. We recommend the robust coefficient of variation (RCoV) for systematically estimating variability, and we underscore its advantages as well as the importance of using a statistically robust and resistant method. Using normalized spread metrics, including RCoV, high variability of monthly mean wind speeds at a location effectively denotes strong fluctuations of monthly total energy generation, and vice versa. Meanwhile, the wind-speed IAVs computed with annual-mean data fail to adequately represent energy-production IAVs of wind farms. Finally, we find that estimates of energy-generation variability require 10±3 years of monthly mean wind-speed records to achieve a 90 % statistical confidence. This paper also provides guidance on the spatial distribution of wind-speed RCoV.
Journal Article
Understanding Biases in Pre-Construction Estimates
by
Sheng, Shuangwen
,
Lee, Joseph C. Y.
,
Philips, Caleb
in
Bias
,
energy generation
,
ENERGY PLANNING, POLICY, AND ECONOMY
2018
The pre-construction energy generation of a wind farm (P50) is difficult to estimate and evaluate. This paper presents a methodology to measure the accuracy of the p50 prediction, which we call the Historical Validation Survey (HVS), for several wind farms in the continental United States. Our results indicate that there is a bias between predicted and measured energy, even when controlling for factors like grid curtailment and resource variability. We also find that our results depend on the assumptions we make during analysis, which we quantify with a sensitivity analysis. This method allows the estimation of uncertainty we have in our findings. When we account for reasonable ranges of model assumptions, we find that, in the most optimistic case, there is still a bulk −5.5% bias when estimating pre-construction energy generation. When controlling for grid curtailment this number reduces to a range of −3.5 to −4.5%.
Journal Article
The Power Curve Working Group's assessment of wind turbine power performance prediction methods
2020
Wind turbine power production deviates from the reference power curve in real-world atmospheric conditions. Correctly predicting turbine power performance requires models to be validated for a wide range of wind turbines using inflow in different locations. The Share-3 exercise is the most recent intelligence-sharing exercise of the Power Curve Working Group, which aims to advance the modeling of turbine performance. The goal of the exercise is to search for modeling methods that reduce error and uncertainty in power prediction when wind shear and turbulence digress from design conditions. Herein, we analyze data from 55 wind turbine power performance tests from nine contributing organizations with statistical tests to quantify the skills of the prediction-correction methods. We assess the accuracy and precision of four proposed trial methods against the baseline method, which uses the conventional definition of a power curve with wind speed and air density at hub height. The trial methods reduce power-production prediction errors compared to the baseline method at high wind speeds, which contribute heavily to power production; however, the trial methods fail to significantly reduce prediction uncertainty in most meteorological conditions. For the meteorological conditions when a wind turbine produces less than the power its reference power curve suggests, using power deviation matrices leads to more accurate power prediction. We also determine that for more than half of the submissions, the data set has a large influence on the effectiveness of a trial method. Overall, this work affirms the value of data-sharing efforts in advancing power curve modeling and establishes the groundwork for future collaborations.
Journal Article
Lowering post‐construction yield assessment uncertainty through better wind plant power curves
by
Fields, M. Jason
,
Optis, Mike
,
Perr‐Sauer, Jordan
in
Algorithms
,
Alternative energy sources
,
Industry standards
2022
Many operational analyses of wind power plants require a statistical relationship, which can be called the wind plant power curve, to be developed between wind plant energy production and concurrent atmospheric variables. Currently, a univariate linear regression at monthly resolution is the industry standard for post‐construction yield assessments. Here, we evaluate the benefits in augmenting this conventional approach by testing alternative regressions performed with multiple inputs, at a finer time resolution, and using nonlinear machine‐learning algorithms. We utilize the National Renewable Energy Laboratory's open‐source software package OpenOA to assess wind plant power curves for 10 wind plants. When a univariate generalized additive model at daily or hourly resolution is used, regression uncertainty is reduced, in absolute terms, by up to 1.0% and 1.2% (corresponding to a −59% and −80% relative change), respectively, compared to a univariate linear regression at monthly resolution; also, a more accurate assessment of the mean long‐term wind plant production is achieved. Additional input variables also reduce the regression uncertainty: when temperature is added as an input to the conventional monthly linear regression, the operational analysis uncertainty connected to regression is reduced, in absolute terms, by up to 0.5% (−43% relative change) for wind power plants with strong seasonal variability. Adding input variables to the machine‐learning model at daily resolution can further reduce regression uncertainty, with up to a −10% relative change. Based on these results, we conclude that a multivariate nonlinear regression at daily or hourly resolution should be recommended for assessing wind plant power curves.
Journal Article
Do Fertility Intentions Affect Fertility Behavior?
1999
We examine the relationship between fertility intentions and fertility behavior using a sample of 2,812 non-Hispanic Whites interviewed twice by the National Survey of Families and Households. Time 1 fertility intentions are strong and persistent predictors of fertility, even after controlling for background and life course variables. The effect is greater when the intentions are held with greater certainty. In contrast, the expected timing of births has a much more modest and short-term effect. Only marital status has an effect with a magnitude that is comparable with that of fertility intentions. Fertility intentions do not mediate the effects of other variables but do contribute additional predictive power. The substantive importance of intentions emphasizes the salience of individual motivations and argues for a redirection of fertility research toward studies of the interactions between the individual and society.
Journal Article
Lowering Post-Construction Yield Assessment Uncertainty Through Better Wind Plant Power Curves
by
Fields, M. Jason
,
Bodini, Nicola
,
Optis, Mike
in
AEP assessment
,
EE - Wind and Water Power Program - Wind (EE-4W)
,
machine learning
2021
Many operational analyses of wind power plants require a statistical relationship, which can be called the wind plant power curve, to be developed between wind plant energy production and concurrent atmospheric variables. Currently, a univariate linear regression at monthly resolution is the industry standard for post-construction yield assessments. Here, we evaluate the benefits in augmenting this conventional approach by testing alternative regressions performed with multiple inputs, at a finer time resolution, and using nonlinear machine-learning algorithms. We utilize the National Renewable Energy Laboratory's open-source software package OpenOA to assess wind plant power curves for 10 wind plants. When a univariate generalized additive model at daily or hourly resolution is used, regression uncertainty is reduced, in absolute terms, by up to 1.0% and 1.2% (corresponding to a -59% and -80% relative change), respectively, compared to a univariate linear regression at monthly resolution; also, a more accurate assessment of the mean long-term wind plant production is achieved. Additional input variables also reduce the regression uncertainty: when temperature is added as an input to the conventional monthly linear regression, the operational analysis uncertainty connected to regression is reduced, in absolute terms, by up to 0.5% (-43% relative change) for wind power plants with strong seasonal variability. Adding input variables to the machine-learning model at daily resolution can further reduce regression uncertainty, with up to a -10% relative change. Based on these results, we conclude that a multivariate nonlinear regression at daily or hourly resolution should be recommended for assessing wind plant power curves.
Journal Article
Lowering post‐construction yield assessment uncertainty through better wind plant power curves
2021
Abstract
Many operational analyses of wind power plants require a statistical relationship, which can be called the wind plant power curve, to be developed between wind plant energy production and concurrent atmospheric variables. Currently, a univariate linear regression at monthly resolution is the industry standard for post‐construction yield assessments. Here, we evaluate the benefits in augmenting this conventional approach by testing alternative regressions performed with multiple inputs, at a finer time resolution, and using nonlinear machine‐learning algorithms. We utilize the National Renewable Energy Laboratory's open‐source software package OpenOA to assess wind plant power curves for 10 wind plants. When a univariate generalized additive model at daily or hourly resolution is used, regression uncertainty is reduced, in absolute terms, by up to 1.0 % and 1.2 % (corresponding to a −59 % and −80 % relative change), respectively, compared to a univariate linear regression at monthly resolution; also, a more accurate assessment of the mean long‐term wind plant production is achieved. Additional input variables also reduce the regression uncertainty: when temperature is added as an input to the conventional monthly linear regression, the operational analysis uncertainty connected to regression is reduced, in absolute terms, by up to 0.5 % (−43 % relative change) for wind power plants with strong seasonal variability. Adding input variables to the machine‐learning model at daily resolution can further reduce regression uncertainty, with up to a −10 % relative change. Based on these results, we conclude that a multivariate nonlinear regression at daily or hourly resolution should be recommended for assessing wind plant power curves.
Journal Article
Measuring the Impact of COVID-19 on Businesses and People
by
Foster, Lucia
,
Fields, Jason
,
Buffington, Catherine
in
INNOVATIONS IN MEASURING THE ECONOMIC IMPACTS OF COVID-19
2021
We provide an overview of Census Bureau activities to enhance the consistency, timeliness, and relevance of our data products in response to the COVID-19 pandemic. We highlight new data products designed to provide timely and granular information on the pandemic’s impact: the Small Business Pulse Survey, weekly Business Formation Statistics, the Household Pulse Survey, and Community Resilience Estimates. We describe pandemic-related content introduced to existing surveys such as the Annual Business Survey and the Current Population Survey. We discuss adaptations to ensure the continuity and consistency of existing data products such as principal economic indicators and the American Community Survey.
Journal Article
High frequency of potential phosphodiesterase type 5 inhibitor drug interactions in males with HIV infection and erectile dysfunction
by
Blaylock, Jason M.
,
Colombo, Rhonda E.
,
Maves, Ryan C.
in
Antiretroviral drugs
,
Antiretroviral therapy
,
Biology and Life Sciences
2021
We sought to determine the prevalence of phosphodiesterase type 5 inhibitor (PDE-5) mediated drug-drug interactions (DDIs) in males with HIV infection receiving antiretroviral therapy (ART) and identify factors associated with PDE-5-mediated DDIs.
Male US Military HIV Natural History Study participants diagnosed with erectile dysfunction (ED) and having a PDE-5 inhibitor and potentially-interacting ART co-dispensed within 30 days were included. DDIs were defined according to criteria found in published guidelines and drug information resources. The primary outcome of interest was overall PDE-5 inhibitor-mediated DDI prevalence and episode duration. A secondary logistic regression analysis was performed on those with and without DDIs to identify factors associated with initial DDI episode.
A total of 235 male participants with ED met inclusion criteria. The majority were White (50.6%) or African American (40.4%). Median age at medication co-dispensing (45 years), duration of HIV infection (14 years), and duration of ED (1 year) did not differ between the two groups (p>0.05 for all). PDE-5 inhibitors included sildenafil (n = 124), vardenafil (n = 99), and tadalafil (n = 14). ART regimens included RTV-boosted protease inhibitors (PIs) atazanavir (n = 83) or darunavir (n = 34), and COBI-boosted elvitegravir (n = 43). Potential DDIs occurred in 181 (77.0%) participants, of whom 122 (67.4%) had multiple DDI episodes. The median DDI duration was 8 (IQR 1-12) months. In multivariate analyses, non-statistically significant higher odds of DDIs were observed with RTV-boosted PIs or PI-based ART (OR 2.13, 95% CI 0.85-5.37) and in those with a diagnosis of major depressive disorder (OR 1.74, 95% CI 0.83-3.64).
PDE-5-mediated DDIs were observed in the majority of males with HIV infection on RTV- or COBI-boosted ART in our cohort. This study highlights the importance of assessing for DDIs among individuals on ART, especially those on boosted regimens.
Journal Article