Search Results Heading

MBRLSearchResults

mbrl.module.common.modules.added.book.to.shelf
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
    Done
    Filters
    Reset
  • Discipline
      Discipline
      Clear All
      Discipline
  • Is Peer Reviewed
      Is Peer Reviewed
      Clear All
      Is Peer Reviewed
  • Item Type
      Item Type
      Clear All
      Item Type
  • Subject
      Subject
      Clear All
      Subject
  • Year
      Year
      Clear All
      From:
      -
      To:
  • More Filters
26 result(s) for "Kassem, Mukhtar A."
Sort by:
Theoretical review on critical risk factors in oil and gas construction projects in Yemen
PurposeThe oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are opting to optimize the project mainly to mitigate the source of risks in construction to achieve the project expectation. Risk factors cause a threat to the project objectives regarding time, cost and quality. It is additionally a vital component in deviating from the client's expectation of productivity, safety and standards. This research aims to investigate the causes of risk in the oil and gas construction projects in Yemen.Design/methodology/approachA comprehensive literature review from various sources including books, conference proceedings, the Internet project management journals and oil and gas industry journals was conducted to achieve the objectives of this study. This initial work was predicated strictly on a literature review and the judgments of experts to develop the risk factor framework for the oil and gas construction projects in Yemen.FindingsThe authors found a few studies related to risk factors in oil and gas construction projects and shared a similar view about general construction projects. However, only a fraction of the factors accepted have included the variances of other studies on a regional basis or specific countries, such as the Yemen situation, due to the differences between the general construction industry and oil and gas industry. Moreover, the factors of these attributes were still accepted due to their applicability to the oil and gas industry, and no significant variances existed between countries. Research has indicated that 51 critical factors cause risks in the oil and gas construction projects in Yemen. Such risk factors can be divided into two major groups: (1) internal risk factors, including seven critical sources of risks, namely client, contractor, consultant, feasibility study and design, tendering and contract, resources and material supply and project management; and (2) external risk factors, including six sources of critical risk factors, namely national economic, political risk, local people, environment and safety, security risk and force-majeure-related risk factors. A risk factor framework was developed to identify the critical risk factors in the oil and gas construction projects in Yemen.Research limitations/implicationsThis research was limited to the oil and gas construction projects.Practical implicationsPractically, this study highlights the risk factors that cause a negative effect on the success of oil and gas construction projects in Yemen. The identification of these factors is the first step in the risk management process to develop strategic responses for risks and enhance the chances of project success.Social implicationsThe identification of risks factors that cause the failure of construction projects helps develop response strategies for these risks, thereby increasing the chances of project success reflected in the oil and gas sector, which is a main tributary of the national economy in developing countries.Originality/valueThis research is the pioneer for future investigations into this vital economic sector. Given the lack of resources and studies in the field of construction projects for the Yemeni oil and gas sector, the Yemeni government, oil companies and researchers in this field are expected to benefit from the results of this study. The critical risk factors specific to the oil and gas construction projects in Yemen should be further investigated with focus only on Yemen and its oil and gas industry players.
Risk Management Assessment in Oil and Gas Construction Projects Using Structural Equation Modeling (PLS-SEM)
Oil and gas construction projects are of great importance to support and facilitate the process of operation and production. However, these projects usually face chronic risks that lead to time overrun, cost overrun, and poor quality, affecting the projects’ success. Hence, this study focused on identifying, classifying, and modeling the risk factors that have negative effects on the success of construction projects in Yemen. The data were collected through a structured questionnaire. Statistical analysis, relative important index method, and probability impact matrix analysis were carried out to classify and rank the risk factors. The partial least squares path modeling or partial least squares structural equation modeling (PLS-PM, PLS-SEM) is a method for structural equation modeling that allows an estimation of complex cause–effect relationships in path models with latent variables. PLS-SEM was employed to analyze data collected from a questionnaire survey of 314 participants comprising the clients, contractors, and consultants working in oil and gas construction projects. The results showed that the goodness of fit index of the model is 0.638. The developed model was deemed to fit because the analysis result of the coefficient of determination test (R2) of the model was 0.720, which indicates the significant explanation of the developed model for the relationship between the causes of risks and their effects on the success of projects. The most impacted internal risk categories include project management, feasibility study design, and resource material availability. The main external risk elements include political, economic, and security considerations. The created risk factor model explained the influence of risk factors on the success of construction projects effectively, according to statistical and expert validation tests.
A Scientometric Analysis and Systematic Literature Review for Construction Project Complexity
The construction industry has been experiencing a rapid increase in complex projects for the last two decades. Simultaneously, project complexity has received more attention from academics and practitioners worldwide. Many studies suggest that perceiving complexity is critical for successful construction project management. This study investigates the current status and future trends in construction project complexity (CPC) literature from the Scopus database. This review systematically uses bibliometric and scientometric methods through co-occurrence and co-citation analysis. First, 644 academic documents were retrieved from the Scopus database. Then, co-occurrence and co-citation analysis were performed along with network visualization to examine research interconnections’ patterns. As a result, relevant keywords, productive authors, and important journals have been highlighted. The prominent research topics within the literature on construction project complexity focus on the following topics: identifying and measuring project complexity, schedule performance and cost estimation, system integration and dynamic capabilities, and risk assessment and uncertainty. Finally, the potential research directions are developing towards safety performance, organizational resilience, and integrated project delivery (IPD). The study still has a limitation. The review focuses only on the academic documents retrieved from the Scopus database, thus restricting the coverage of the reviewed literature relating to construction project complexity. To the best of the author’s knowledge, this study is the first study that provides a systematic review of the literature from the Scopus database on construction project complexity.
Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review
Building information modelling (BIM) has become increasingly popular in construction projects in recent years. Simultaneously, project management has received more attention from academics and practitioners worldwide. Many studies have suggested that perceiving collaboration and risk are critical for successful construction project management. This study investigates the current status and future trends in building information modeling (BIM) literature from the Web of Science database. This review systematically uses bibliometric and systematic literature review (SLR) methods through co-occurrence and co-citation analysis. First, 650 academic documents were retrieved from the Web of Science database. Then, co-occurrence and co-citation analyses were performed along with network visualization to examine research interconnections’ patterns. As a result, relevant keywords, productive authors, and important journals have been highlighted. The prominent research topics within the literature on building information modelling focus on the following topics: collaborative in BIM, integration of BIM, GIS and Internet of Things (IoT), barriers to the integration of BIM, sustainability and BIM, and risk assessment and uncertainty. Finally, the potential research directions are developing towards digital twin technology, integration of BIM and AI, and Augmented Reality (AR) and BIM. The presented findings of only 88 articles discuss the collaboration and risk issue in BIM for the construction industry and thus confirms the need for more studies on this topic to enhance the chances of successfully building information modelling projects. The review focuses only on the academic documents retrieved from the Web of Science database, thus restricting the coverage of the reviewed literature relating to building information modelling collaboration and risk.
Construction Industry from Perspective of Force Majeure and Environmental Risk Compared to the COVID-19 Outbreak: A Systematic Literature Review
The COVID-19 pandemic represents a type of force majeure that significantly and unexpectedly affected all human lifestyles. This study includes an integrative review of articles published across Scopus and Web of Science journals and compiled using the systematic review methodology based on the PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) Statement and VOSreview (visualization of similarities) software by defining keywords that include “construction industry” and “force majeure” and “environmental risks” as a starting point. Moreover, the research years and the countries covered by this research were determined in a second stage. Finally, the abstracts of selected studies were reviewed in order to extract factors similar to the pandemic conditions of COVID-19 along with the brief results of the research. Out of 6384 publications identified and 56 publications reporting, 20 studies fulfilled the inclusion criteria with full text. Based on our findings, there has been a continuous growth of publications on construction risk and environmental research since 2010. Malaysia had the greatest contribution to the research topic of the countries covered by the study, followed by Egypt. The Engineering, Construction and Architectural Management journal published the greatest number of publications related to the research topic. In this review, the most important previous studies are classified according to their handling of force majeure and environmental risks and the most important factors mentioned in these studies are identified. In addition, recommendations are made for dealing with the COVID-19 pandemic and for mitigating its effects on the construction industry in the Arab world and Malaysia. The results of this review will benefit researchers and construction companies alike in furthering research on reducing the risks of COVID-19 to construction projects and avoiding the significant economic loss that results from stopping these projects.
Early detection of construction project risks in Saudi Arabia: a mixed-methods study on warning signs and mitigation
In the context of construction risk management in Saudi Arabia, this research identifies and triangulates the Early Warning Signs (EWS) for construction project failure. Two mixed-methods approaches were used. First, a questionnaire survey of construction professionals was conducted to elicit EWS and identify mitigation actions. Second, participants were invited to participate in a Nominal Group Technique (NGT) session and prioritize the EWS and identify mitigation actions. The survey was developed from existing literature and a pilot study to include 41 items, and was found to have high internal reliability (Cronbach’s α = 0.86). Descriptive statistical analysis was used to analyze data from the survey, and the qualitative phase of the research was used to achieve consensus in prioritization of EWS and to describe mitigation options. The findings of this research provided converging evidence that the following EWS exist for construction failure: management’s failure to respond effectively, weak project definition, ineffective leadership, grossly inaccurate costs, and a lack of project experience. The study provides context-sensitive mitigation options, including improving the tendering and cost engineering functions, improving the front-end definition and resource planning of construction projects, establishing effective leadership and reporting procedures, and institutionalizing risk registers and lessons learned. Overall, the findings of this research will inform early warning signs for risk management and provide a foundation for subsequent case study evaluation of the effectiveness of mitigation measures in Saudi Arabia.
Risk factors in oil and gas construction projects in developing countries: a case study
Purpose This study aims to investigate the risk factors in construction projects in oil and gas processing facilities in Yemen and serves as a case study for developing countries. Design/methodology/approach By using a questionnaire, data were collected from 201 project managers and engineers employed in different sectors in the oil and gas industry in Yemen. Findings The survey analysis based on Kruskal–Wallis test method shows a high degree of agreement on the perceptions of risk factors depending on categories of companies. In other words, the tested risk factors exist in all sectors of oil companies in Yemen and are valid as a measure of risk factors in construction projects in oil and gas organizations in general. Although no evidence suggests that the risk factors differ significantly according to job title, the result of identifiable risk factors according to experience shows a statistically significant difference among participants in terms of their experience. The relative importance of the ranking of risk factors was obtained by the statistical analysis of responses on the impact and likelihood of occurrence of these risks. Findings show that internal risks are the greatest influential factors in construction projects in the oil and gas sector, followed by changes during construction project, government instability, incorrect project cost estimation, government delay in decision making, incorrect project schedule estimation, and political situation and war in the country. Originality/value These findings are valuable to organizations that are planning to conduct construction projects for oil and gas processing facilities in Yemen and other nations with similar environments, such as developing countries.
Structural modelling of internal risk factors for oil and gas construction projects
Purpose Project failure is the result of one or a combination of several causes of risk factors that are very important to identify for effective performance. This study aims to focus on studying the fundamental relationship between internal risk factors and the negative effect on oil and gas project success in Yemen using the partial least square structural equation modelling (PLS-SEM) method. Design/methodology/approach Data collection was carried out using a formal questionnaire survey of the oil field sector in Yemen by companies involved in mega-oil and gas construction projects. A hierarchical model for determining causative internal risk factors and their effects was developed and evaluated using SEM method by SmartPLS3 software technology. Findings The findings of analyzing model indicate that all categories have a significant effect on project success, while the most significant affected categories in the internal risk factors are project management factors, feasibility study-design and resources-material supply with a path coefficient value of 0.213, 0.197 and 0.186, respectively. Moreover, for the hypotheses test, the positive relationship means that all experimental hypotheses are accepted according to path coefficient value analysis. In addition, the internal risk factors research model shows the ranking of effects on project success starting with project stoppage (loading factor 0.841), cost overruns (loading factor 0.818), time overruns (loading factor 0.726) and project target failure with loading factor 0.539. Research limitations/implications The research was limited to the oil and gas construction projects in Yemen. Practical implications Interpreting the relationship between internal risk factors and their impact on the success of construction projects in the oil and gas sector will assist project team and oil companies in developing risk response strategies and developing appropriate plans to mitigate the effects of risks, which is presented in this paper. Originality/value The paper explains the relationship between cause and effect of internal risk factors in oil and gas projects in Yemen, and is expected to be a guideline for the oil companies and future academic research in the risk management area.
Renewable Energy Integration for Net-Zero Buildings: Challenges, Opportunities, and Strategic Pathways
Buildings account for nearly 40% of global energy use and 36% of CO2 emissions, positioning Net-Zero Energy Buildings (NZEBs) as vital for climate mitigation. However, large-scale adoption remains limited by technical, economic, and policy barriers. This study systematically reviews 1285 peer-reviewed articles (2015–2025) from Scopus and Web of Science, following PRISMA guidelines and thematic analysis to assess renewable energy integration and efficiency strategies. Results indicate that 70% of studies highlight emissions reduction and cost savings as key NZEB benefits, while 60% cite high storage costs and 45% report grid integration challenges. Only 30% of studies address policy dependency, revealing a research gap. Effective measures include passive solar design (up to 25% heating load reduction), high-performance envelopes (15–40% energy savings), and smart energy management (10–20% efficiency gains). Persistent obstacles involve high upfront costs, renewable variability, and rapid technological obsolescence. Achieving NZEB viability requires integrating energy-efficient design, affordable renewables, advanced storage, and coherent policy frameworks to accelerate the transition toward a sustainable, NZEB-built environment.
The Current Risk Management Practices and Knowledge in the Construction Industry
Construction is a critical sector of any economy in terms of value production, labor, and contributing to the gross national product. Managing risk is a relatively young area in Yemen’s construction sector, but it is gaining traction as building activity and competition rise. Construction firms mitigate risk by using a variety of risk management methods. Therefore, there is a need to assess these procedures in order to detect shortcomings. This research aims to establish the existing risk management strategies used in Yemeni building projects. Survey questionnaires were used to collect data. Respondents were drawn from Yemeni construction businesses. Risk management is not executed systematically, intentionally, or continuously, and most firms’ risk management procedures are reactive, semipermanent, informal, and unstructured, with no or few dedicated resources to address risks. This strategy is inconsistent with generally accepted risk management principles. Nonetheless, the findings suggest a general understanding of risk management and a willingness to learn from previous errors. The study of the findings suggests that risk identification approaches such as judgment and historical data are employed for risk analysis, and that the industry typically attempts to avoid or transfer risks in Yemeni building projects. The results shed light on the shortcomings of Yemen’s project management practices. To guarantee that construction projects obtain maximum value for money, project managers of big construction businesses in Yemen need a strong understanding of and training in globally accepted systematic risk management procedures. Finally, this study can help future stakeholders determine how to work together to manage risk.