Catalogue Search | MBRL
Search Results Heading
Explore the vast range of titles available.
MBRLSearchResults
-
DisciplineDiscipline
-
Is Peer ReviewedIs Peer Reviewed
-
Item TypeItem Type
-
SubjectSubject
-
YearFrom:-To:
-
More FiltersMore FiltersSourceLanguage
Done
Filters
Reset
3
result(s) for
"Lempert, Kenneth D."
Sort by:
Renal Failure Patients in Disasters
by
Lempert, Kenneth D.
,
Kopp, Jeffrey B.
in
Chronic illnesses
,
Civil Defense - methods
,
Civil Defense - trends
2019
Disasters occur regularly, and frequently large numbers of patients treated with maintenance dialysis or with the recent onset of acute kidney injury are put at risk owing to the lack of access to dialysis care precipitating also a kidney failure disaster. The absence of necessary dialysis treatments can result in excessive emergency department visits, hospitalizations, morbidity, or an early death. Those with kidney failure are often evaluated in disaster medical locations or hospitals without nephrologists in attendance. Here we offer guidance for medical personnel evaluating such patients so that dialysis-dependent individuals can be properly assessed and managed with the need for urgent dialysis recognized. A disaster dialysis triage system is proposed. (Disaster Med Public Health Preparedness. 2019;13:782–790)
Journal Article
Improvement of Hemodialysis Catheter Function with Tenecteplase: A Phase III, Open-Label Study: TROPICS 4
2011
Hemodialysis (HD) catheters are prone to thrombotic occlusion. We evaluated tenecteplase, a thrombolytic, for the treatment of dysfunctional HD catheters. Patients with tunneled HD catheters and blood flow rate (BFR) <300 mL/min received open-label tenecteplase (2 mg/lumen) for a 1 h intracatheter dwell. Treatment success was defined as BFR ≥300 mL/min and a ≥25 mL/min increase from baseline BFR, 30 min before and at the end of HD. Patients without treatment success at the end of the initial visit received another 2 mg dose of tenecteplase for an up to 72 h extended dwell. Of 223 enrolled patients, 34% (95% confidence interval [CI], 28–40%) had treatment success after a 1 h dwell. Mean (standard deviation [SD]) BFR change from baseline was 82 (124) mL/min. Treatment success in those who received extended-dwell tenecteplase (
n
= 116) was 49% (95% CI, 40–58%), with mean (SD) BFR change from baseline of 117 (140) mL/min. Reported targeted adverse events included five catheter-related bloodstream infections and one thrombosis. No intracranial hemorrhage, major bleeding, embolic events, or catheter-related complications were reported. Tenecteplase administered as a 1 h or 1 h plus extended dwell was associated with improved HD catheter function in the TROPICS 4 trial.
Journal Article
Resilience of the Eastern African electricity sector to climate driven changes in hydropower generation
by
Rogner, H-Holger
,
Neumann, James E.
,
Broad, Oliver
in
704/106/694/2739
,
704/844/2739
,
704/844/841
2019
Notwithstanding current heavy dependence on gas-fired electricity generation in the Eastern African Power Pool (EAPP), hydropower is expected to play an essential role in improving electricity access in the region. Expansion planning of electricity infrastructure is critical to support investment and maintaining balanced consumer electricity prices. Variations in water availability due to a changing climate could leave hydro infrastructure stranded or result in underutilization of available resources. In this study, we develop a framework consisting of long-term models for electricity supply and water systems management, to assess the vulnerability of potential expansion plans to the effects of climate change. We find that the most resilient EAPP rollout strategy corresponds to a plan optimised for a slightly wetter climate compared to historical trends. This study demonstrates that failing to climate-proof infrastructure investments can result in significant electricity price fluctuations in selected countries (Uganda & Tanzania) while others, such as Egypt, are less vulnerable.
Hydropower generation in the Nile River Basin is vulnerable to climatic changes. Here, the authors assess infrastructure resilience of the Eastern African power pool (EAPP) to the effects of a changing climate and suggest that failing to climate-proof infrastructure investments can result in significant electricity price fluctuations.
Journal Article