Search Results Heading

MBRLSearchResults

mbrl.module.common.modules.added.book.to.shelf
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
    Done
    Filters
    Reset
  • Discipline
      Discipline
      Clear All
      Discipline
  • Is Peer Reviewed
      Is Peer Reviewed
      Clear All
      Is Peer Reviewed
  • Item Type
      Item Type
      Clear All
      Item Type
  • Subject
      Subject
      Clear All
      Subject
  • Year
      Year
      Clear All
      From:
      -
      To:
  • More Filters
2 result(s) for "Pathirikkat GOPAKUMAR G. Surya CHANDRA M. Jaya Bharata REDDY Dusmata Kumar MOHANTA"
Sort by:
Optimal placement of PMUs for the smart grid implementation in Indian power grid A case study
Efficient utilization of energy resources is essential for a developing country like India. The concept of smart grid (SG) can provide a highly reliable power system with optimized utilization of available resources. The present Indian power grid requires revolutionary changes to meet the growing demands and to make the grid smarter and reliable. One of the important requirements for SG is the instantaneous monitoring of the voltage, current and power flows at all buses in the grid. The traditional monitoring system cannot satisfy this requirement since they are based on nonlinear power flow equations. Synchro-phasor-measurement devices like phasor mea- surement units (PMUs) can measure the phasor values of voltages at installed buses. Consequently, the currents passing through all branches connected to that bus can be computed. Since the voltage phasor values at the neighboring buses of a bus containing the PMU can be estimated using Ohm's law, it is redundant to install PMUs at all the buses in a power grid for its complete observability. This paper proposes the optimal geographi- cal locations for the PMUs in southern region Indian power grid for the implementation of SG, using Integer Linear Programming. The proposed optimal geographical locations for PMU placement can be a stepping stone for the implementation of SG in India.
Optimal redundant placement of PMUs in Indian power grid -- northern, eastern and north-eastern regions
Effective utilization of renewable energy sources and efficient management of electric energy are essential for any developing countries like India. This can be envisioned through the implementation of concepts of smart grid (SG). One of the key requisites for SG implementation is that the grid should be completely observable. Renovation of conventional Indian power grid to a SG necessitates incorporation of the phasor measurement units (PMUs) in the present power grid measurement and monitoring system. Since the cost of PMU is high and any bus containing a PMU makes the neighboring connected buses observable, optimal placement of PMUs is very important for complete observability of the grid. This paper proposes optimal redundant geographical locations in the northern, eastern and north-eastern regions of Indian power grid for PMU placement. The PMUs installed in these geographical locations will make the grid completely observable and maintain the observability under the conditions of failure of some PMUs or branch outages. Integer linear programming has been used for finding the optimal PMU locations. The results proposed in this paper can be a stepping stone for revamping the Indian power grid to a SG ensuring complete observability during different contingency conditions.