Search Results Heading

MBRLSearchResults

mbrl.module.common.modules.added.book.to.shelf
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
    Done
    Filters
    Reset
  • Discipline
      Discipline
      Clear All
      Discipline
  • Is Peer Reviewed
      Is Peer Reviewed
      Clear All
      Is Peer Reviewed
  • Item Type
      Item Type
      Clear All
      Item Type
  • Subject
      Subject
      Clear All
      Subject
  • Year
      Year
      Clear All
      From:
      -
      To:
  • More Filters
3 result(s) for "相量测量单元"
Sort by:
A dynamic phasor estimation algorithm based on angle-shifted energy operator
Under dynamic conditions, the signals of power system have time-varying magnitude and frequency, which might lead to considerable errors for synchrophasor measurement. The traditional discrete Fourier transform (DFT) based algorithms used in Phasor Measurement Unit (PMU) are hard to meet the requirements of measurement accuracy because of the existence of spectral leakage. A dynamic phasor measurement algorithm is proposed in this paper in which the input sampled data are considered as non-stationary signals with amplitude modulation-frequency modulation (AM-FM) form, and the measurement is achieved by AM-FM demodulation. An angle-shifted energy operator (ASEO) is used to extract the instantaneous amplitude and low pass differential filter is introduced for frequency estimation. Simulation results indicate that the proposed algorithm can effectively improve the phasor measurement accuracy and has very short response time for PMU under dynamic conditions.
Pragmatic multi-stage simulated annealing for optimal placement of synchrophasor measurement units in smart power grids
Conventional power grids across the globe are reforming to smart power grids with cutting edge technologies in real time monitoring and control methods. Advanced real time monitoring is facilitated by incorporating synchrophasor measurement units such as phasor measurement units (PMUs) to the power grid monitoring system. Several physical and economic constraints limit the deployment of PMUs in smart power grids. This paper proposes a pragmatic multi-stage simulated annealing (PMSSA) methodology for finding the optimal locations in the smart power grid for installing PMUs in conjunction with existing conventional measurement units (CMUs) to achieve a complete observability of the grid. The proposed PMSSA is much faster than the conventional simulated annealing (SA) approach as it utilizes controlled uphill and downhill movements during various stages of optimization. Moreover, the method of integrating practical phasor measurement unit (PMU) placement conditions like PMU channel limits and redundant placement can be easily handled. The efficacy of the proposed methodology has been validated through simulation studies in IEEE standard bus systems and practical regional Indian power grids.
Optimal redundant placement of PMUs in Indian power grid -- northern, eastern and north-eastern regions
Effective utilization of renewable energy sources and efficient management of electric energy are essential for any developing countries like India. This can be envisioned through the implementation of concepts of smart grid (SG). One of the key requisites for SG implementation is that the grid should be completely observable. Renovation of conventional Indian power grid to a SG necessitates incorporation of the phasor measurement units (PMUs) in the present power grid measurement and monitoring system. Since the cost of PMU is high and any bus containing a PMU makes the neighboring connected buses observable, optimal placement of PMUs is very important for complete observability of the grid. This paper proposes optimal redundant geographical locations in the northern, eastern and north-eastern regions of Indian power grid for PMU placement. The PMUs installed in these geographical locations will make the grid completely observable and maintain the observability under the conditions of failure of some PMUs or branch outages. Integer linear programming has been used for finding the optimal PMU locations. The results proposed in this paper can be a stepping stone for revamping the Indian power grid to a SG ensuring complete observability during different contingency conditions.