Search Results Heading

MBRLSearchResults

mbrl.module.common.modules.added.book.to.shelf
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
    Done
    Filters
    Reset
  • Discipline
      Discipline
      Clear All
      Discipline
  • Is Peer Reviewed
      Is Peer Reviewed
      Clear All
      Is Peer Reviewed
  • Item Type
      Item Type
      Clear All
      Item Type
  • Subject
      Subject
      Clear All
      Subject
  • Year
      Year
      Clear All
      From:
      -
      To:
  • More Filters
1 result(s) for "Modified Newton Raphson Based Optimizer"
Sort by:
Optimal allocation of hybrid PVDG and DSVC devices into distribution grids using a modified NRBO algorithm considering the overcurrent protection characteristics
The never-ending issue of inadequate energy availability is constantly on the outermost layer. Consequently, an ongoing effort has been made to improve electric power plants and power system configurations. Photovoltaic Distributed Generators (PVDG) and compensators such as Distributed Static Var Compensator (DSVC) are the center of these recent advances. Due to its high complexity, these devices’ optimum locating and dimensions are a relatively new issue in the Electrical Distribution Grid (EDG). A modified version of Newton Raphson Based Optimizer (mNRBO) has been carried out to optimally allocate the PVDG and DSVC devices in tested IEEE 33 and 69 bus EDG. The mNRBO algorithm integrates four parameters to enhance NRBO’s performance by addressing its limitations in balancing exploration and exploitation. The article suggested novel Multi-Objective Functions (MOF), which have been considered to optimize concurrently the overall amount of active power loss (APL), voltage deviation (VD), relays operation time (TR ELAY ), as well as improve the coordination time interval (CTI) between primaries and backup relays set up in EDG. The proposed mNRBO algorithm surpasses its basic NRBO version, as long as another alternative algorithm, while providing very good results, such as minimizing the APL from 210.98 kW until 26.482 kW and 224.948 kW until 18.763 kW for the IEEE 33 and 69 bus respectively. Which proves the capability of the mNRBO algorithm of solving such power system challenges.