Catalogue Search | MBRL
Search Results Heading
Explore the vast range of titles available.
MBRLSearchResults
-
LanguageLanguage
-
SubjectSubject
-
Item TypeItem Type
-
DisciplineDiscipline
-
YearFrom:-To:
-
More FiltersMore FiltersIs Peer Reviewed
Done
Filters
Reset
36,997
result(s) for
"Warranties"
Sort by:
Vorhes honed GM buyer satisfaction, warranties
by
Hodder, Riley
in
Warranties
2025
Trade Publication Article
Random replacement policies to sustain the post-warranty reliability
2023
PurposeThe study aims to design the limited number of random working cycle as a warranty term and propose two types of warranties, which can help manufacturers to ensure the product reliability during the warranty period. By extending the proposed warranty to the consumer's post-warranty maintenance model, besides the authors investigate two kinds of random maintenance policies to sustain the post-warranty reliability, i.e. random replacement first and random replacement last. By integrating depreciation expense depending on working time, the cost rate is constructed for each random maintenance policy and some special cases are provided by discussing parameters in cost rates. Finally, sensitivities on both the proposed warranty and random maintenance policies are analyzed in numerical experiments.Design/methodology/approachThe working cycle of products can be monitored by advanced sensors and measuring technologies. By monitoring the working cycle, manufacturers can design warranty policies to ensure product reliability performance and consumers can model the post-warranty maintenance to sustain the post-warranty reliability. In this article, the authors design a limited number of random working cycles as a warranty term and propose two types of warranties, which can help manufacturers to ensure the product reliability performance during the warranty period. By extending a proposed warranty to the consumer's post-warranty maintenance model, the authors investigate two kinds of random replacement policies to sustain the post-warranty reliability, i.e. random replacement first and random replacement last. By integrating a depreciation expense depending on working time, the cost rate is constructed for each random replacement and some special cases are provided by discussing parameters in the cost rate. Finally, sensitivities to both the proposed warranties and random replacements are analyzed in numerical experiments.FindingsIt is shown that the manufacturer can control the warranty cost by limiting number of random working cycle. For the consumer, when the number of random working cycle is designed as a greater warranty limit, the cost rate can be reduced while the post-warranty period can't be lengthened.Originality/valueThe contribution of this article can be highlighted in two key aspects: (1) the authors investigate early warranties to ensure reliability performance of the product which executes successively projects at random working cycles; (2) by integrating random working cycles into the post-warranty period, the authors is the first to investigate random maintenance policy to sustain the post-warranty reliability from the consumer's perspective, which seldom appears in the existing literature.
Journal Article
Competitive and Collaborative Quality and Warranty Management in Supply Chains
Product quality and product warranty coverage are two important and closely related operational decisions. A longer warranty protection period can boost sales, but it may also result in dramatically increased warranty cost, if product quality is poor. To investigate how these two decisions interact with each other and influence supply chain performance, we develop a single‐period model with a supplier that provides a product to an original equipment manufacturer, which in turn sells it to customers. Customer demand is random and affected by the length of the product warranty period. Warranty costs are incurred by both the supplier and the manufacturer. We analyze two different scenarios based on which party sets the warranty period: manufacturer warranty and supplier warranty. Product quality is controlled by the supplier, and the manufacturer determines the ordering quantity. We analyze these decentralized systems and provide the structural properties of the equilibrium strategies. We also compare the results of centralized and decentralized systems and identify the conditions under which one system provides a longer warranty and better product quality than the other. Our numerical study further shows that, in decentralized settings, when the warranty period is determined by the firm sharing the larger proportion of total warranty costs, the supply chain can achieve greater system‐wide profit. Both parties can therefore benefit from properly delegating the warranty decision and sharing the resulting additional profit. We further design a supplier‐development and buy‐back contract for coordinating decentralized supply chains. Several extensions are also discussed.
Journal Article
Opportunistic Maintenance Strategy for Complex Equipment with a Genetic Algorithm Considering Failure Dependence: A Two-Dimensional Warranty Perspective
by
Bai, Yongsheng
,
Gao, Tielu
,
Wang, Rongcai
in
Comparative analysis
,
complex equipment
,
Consumers
2022
Complex two-dimensional warranty equipment is usually composed of many multi-component systems, which include several key components. During the warranty period, conducting maintenance according to the preventive maintenance plan of each component will increase the warranty costs. Opportunistic maintenance is an effective approach to combine the preventive maintenance of each individual component, which can reduce the warranty cost and improve the system availability. This study explored the optimal opportunistic maintenance scheme of multi-component systems. Firstly, the failure rate model and reliability evaluation model of the multi-component system considering failure dependence were established. Secondly, the preventive maintenance plan of each individual component was determined, with the goal of obtaining the lowest warranty cost per unit time in the component life cycle. Thirdly, the preventive maintenance work of each individual component was combined, and the two-dimensional warranty cost model of the multi-component system was established according to the reliability threshold when performing opportunistic maintenance. In the experimental verification and result analysis, the genetic algorithm was used to find the optimal opportunistic maintenance scheme for the power transmission device. The comparative analysis results show that the opportunistic maintenance scheme reduced the warranty cost by 5.5% and improved the availability by 10%, which fully verified the effectiveness of the opportunistic maintenance strategy.
Journal Article