Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Effects Analysis of Forced Cooling Rate on Microstructure, Tensile Strength and Hardness of Superheater Tube in Pulverized Coal Boiler
by
Andri, Andri
, Sutikno, Sutikno
in
Boiler tubes
/ Cooling rate
/ Power plants
/ Pulverized coal
/ Shutdowns
/ Steam electric power generation
2019
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Effects Analysis of Forced Cooling Rate on Microstructure, Tensile Strength and Hardness of Superheater Tube in Pulverized Coal Boiler
by
Andri, Andri
, Sutikno, Sutikno
in
Boiler tubes
/ Cooling rate
/ Power plants
/ Pulverized coal
/ Shutdowns
/ Steam electric power generation
2019
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Effects Analysis of Forced Cooling Rate on Microstructure, Tensile Strength and Hardness of Superheater Tube in Pulverized Coal Boiler
Journal Article
Effects Analysis of Forced Cooling Rate on Microstructure, Tensile Strength and Hardness of Superheater Tube in Pulverized Coal Boiler
2019
Request Book From Autostore
and Choose the Collection Method
Overview
The availability (readiness) of a Steam Power Plant (PLTU) is an important factor, since one income from a Power Plant is based on its readiness reflected in the EAF (Equivalent Availibility Factor). Factor opposite to Availibility is Outage. Outage occurs when a unit is out of sync to a network and not in a Reserve Shutdown state.
Publisher
Trans Tech Publications Ltd
Subject
This website uses cookies to ensure you get the best experience on our website.