Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Approaches to Autonomous Aerobraking at Mars
by
Hanna, J. L
, Toison, R. H
in
Accelerometers
/ Aerobraking
/ Mars
/ Mars Global Surveyor
/ Mars Odyssey Mission (NASA)
/ Measuring instruments
/ Onboard
/ Orbits
/ Sequences
/ Spacecraft
2002
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Approaches to Autonomous Aerobraking at Mars
by
Hanna, J. L
, Toison, R. H
in
Accelerometers
/ Aerobraking
/ Mars
/ Mars Global Surveyor
/ Mars Odyssey Mission (NASA)
/ Measuring instruments
/ Onboard
/ Orbits
/ Sequences
/ Spacecraft
2002
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Journal Article
Approaches to Autonomous Aerobraking at Mars
2002
Request Book From Autostore
and Choose the Collection Method
Overview
Planetary atmospheric aerobraking will most likely be incorporated in every future Mars orbiting mission. Aerobraking requires an intensive workload during operations. To provide safe and efficient aerobraking, both navigation and spacecraft system teams must be extremely diligent in updating spacecraft sequences and performing periapsis raise or lower maneuvers to maintain the required orbital energy reduction without exceeding the design limits of the spacecraft. Automating the process with onboard measurements could significantly reduce the operational burden and, in addition, could reduce the potential for human error. Two levels of automation are presented and validated using part of the Mars Global Surveyor aerobraking sequence and a simulated Mars Odyssey sequence. The simplest method only provides the capability to update the onboard sequence. This method uses onboard accelerometer measurements to estimate the change in orbital period during an aerobraking pass and thereby estimates the beginning of the next aerobraking sequence. Evaluation of the method utilizing MGS accelerometer data showed that the time of the next periapsis can be estimated to within 25% 3σ of the change in the orbital period due to drag. The second approach provides complete onboard orbit propagation. A low-order gravity model is proposed that is sufficient to provide periapsis altitude predictions to within 100–200 meters over three orbits. Accelerometer measurements are used as part of the trajectory force model while the spacecraft is in the atmosphere.
Publisher
Springer Nature B.V
Subject
MBRLCatalogueRelatedBooks
Related Items
Related Items
This website uses cookies to ensure you get the best experience on our website.