The application of “line drilling” and “buffer holes” methods to reduce blasting vibration
by
Syafiq Isnaya, M.
, Pradasara, Chani
, Pradatama, Dhion
in
Blasting
/ Blasting (explosive)
/ Drilling
/ Vibration
/ Vibrations
2021
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
The application of “line drilling” and “buffer holes” methods to reduce blasting vibration
by
Syafiq Isnaya, M.
, Pradasara, Chani
, Pradatama, Dhion
in
Blasting
/ Blasting (explosive)
/ Drilling
/ Vibration
/ Vibrations
2021
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
The application of “line drilling” and “buffer holes” methods to reduce blasting vibration
Journal Article
The application of “line drilling” and “buffer holes” methods to reduce blasting vibration
2021
Request Book From Autostore
and Choose the Collection Method
Overview
PT Multi Nitrotama Kimia is one of the largest mining service companies that provide blasting services and sales of explosives in Indonesia. PT Putra Perkasa Abadi Jobsite Borneo Indobara is one of PT Multi Nitrotama Kimia’s customers who is facing challenges in optimizing blasting activities. Currently, blasting activities at PT Putra Perkasa Abadi Jobsite Borneo Indobara are carried out within 500 m of the active slope, so that the blasting distance is optimized. In optimizing the blasting distance, it is necessary to maintain slope conditions (no underbreak / no overbreak) and to consider the vibration of blasting results on the slopes. The line drilling method was chosen for the blasting trial stage. In the observation activity, an analysis of the resulting blasting and fragmentation vibrations was carried out. Precise planning and good control in field operations play an important role in this experimental process. Based on the results of the blasting trial, no damage was found in the area 25 m – 100 m from the blasting location and a 10% - 20% reduction in blasting vibration results (Peak Vector Sum) was obtained when compared between normal blasting designs with controlled blasting designs.