Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Memory and progress: confessions in a flagstone wall
by
McVicar, Mhairi
in
Architecture
/ Brown, George Mackay
/ Building materials
/ Culture
/ design
/ Poetry
/ Stone
2007
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Memory and progress: confessions in a flagstone wall
by
McVicar, Mhairi
in
Architecture
/ Brown, George Mackay
/ Building materials
/ Culture
/ design
/ Poetry
/ Stone
2007
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Journal Article
Memory and progress: confessions in a flagstone wall
2007
Request Book From Autostore
and Choose the Collection Method
Overview
The wall, as constructed, is 519.5mm thick, plus or minus the irregularities of reused flagstone. It consists of 12.5mm plasterboard, a vapour barrier, 145mm timber studs, 150mm ‘Rockwool’ insulation, 12mm Far Eastern marine grade plywood, ‘Tyvek’ building membrane, a 50mm cavity, stainless-steel wall ties, an unforeseen leaf of 100mm concrete block, and a heavily debated skin of 200–300mm reused flagstone. It follows the original footprint of an 1840s longhouse, now reduced, perhaps, to a representational role. Built by a team of three – two architects and a marine biologist – this wall is the result of five years of planning, sketching, drawing, specifying, sourcing, shipping, and self-building. It contains adaptations, compromises, guilt and uncertainties. The project draws both from phenomenological beliefs concerning a site embedded with accumulated memories, and rationalised predictions developed from a Modernist architectural education. The constructed result stands as a negotiation between theoretical aims and the pragmatics of a self-build on an exposed island.
Publisher
Cambridge University Press
Subject
This website uses cookies to ensure you get the best experience on our website.