Value Stream Mapping as Lean Production tool to improve the production process organization – case study in packaging manufacturing
by
Klimecka-Tatar, Dorota
in
Lean Production
/ packing
/ VSM
2017
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Value Stream Mapping as Lean Production tool to improve the production process organization – case study in packaging manufacturing
by
Klimecka-Tatar, Dorota
in
Lean Production
/ packing
/ VSM
2017
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Value Stream Mapping as Lean Production tool to improve the production process organization – case study in packaging manufacturing
Journal Article
Value Stream Mapping as Lean Production tool to improve the production process organization – case study in packaging manufacturing
2017
Request Book From Autostore
and Choose the Collection Method
Overview
In the paper, the method of the production process improvement with the use of lean production tools has been presented. The Value Stream Mapping (VSM) for the cardboard packaging production process has been presented. On the basis of the current state map (CSM), areas for improvement have been designated – 5 organizational changes of the process were marked out. To minimize the three basic losses excessive storage, unnecessary movement and delays, the changes were introduced in the method of inter-operative transport, supervision of the storage condition (input and output of the process), control at the processing operation and the use of a production loop. As a result of the changes, it is possible to shorten the process time, shorten the total time of operations adding value and reduce the number of non-compliant products.