MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Digital twin-driven dynamic scheduling of a hybrid flow shop
Digital twin-driven dynamic scheduling of a hybrid flow shop
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Digital twin-driven dynamic scheduling of a hybrid flow shop
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Digital twin-driven dynamic scheduling of a hybrid flow shop
Digital twin-driven dynamic scheduling of a hybrid flow shop

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Digital twin-driven dynamic scheduling of a hybrid flow shop
Digital twin-driven dynamic scheduling of a hybrid flow shop
Journal Article

Digital twin-driven dynamic scheduling of a hybrid flow shop

2023
Request Book From Autostore and Choose the Collection Method
Overview
Industries require, nowadays, to be more adaptable to unforeseen real-time events as well as to the rapid evolution of their market (e.g. multiplication of customers, increasingly personalized and unpredictable demand, etc.). To meet these challenges, manufacturers need new solutions to update their production plan when a change in the production system or its environment occurs. In this context, our research work deals with a dynamic scheduling problem of a real Hybrid Flow Shop considering the specific constraints of a perfume manufacturing company. This paper proposes a Digital Twin-driven dynamic scheduling approach based on the combination of both optimization and simulation. For the optimization, we have developed a mixed integer linear programming (MILP) scheduling model taking into account the main specific scheduling requirements of our case study. Regarding the simulation approach, a 3D shop floor model has been developed including the additional stochastic aspects and constraints which are difficult or impossible to model with a MILP approach. These two models are connected with the real shop floor to create a digital twin (DT). The developed DT allows the re-scheduling of production according to internal and external events. Finally, validation scenarios on a perfume case study have been designed and implemented in order to demonstrate the feasibility and the relevance of the proposed digital twin-driven dynamic scheduling approach.