Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
A Regional Road Network Capacity Estimation Model for Mountainous Cities Based on Auxiliary Map
by
Cai, Xiaoyu
, Chen, Ning
, Wang, Fei
, Yang, Tao
, Xing, Ruru
, Peng, Bo
in
Central business districts
/ Efficiency
/ Energy consumption
/ Linear programming
/ Literature reviews
/ Local transit
/ Public transportation
/ Roads & highways
/ Simulation
/ Simulation methods
/ Sustainability
/ Sustainable development
/ Sustainable urban development
/ Traffic assignment
/ Traffic congestion
/ Traffic control
/ Traffic flow
/ Transportation planning
2023
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
A Regional Road Network Capacity Estimation Model for Mountainous Cities Based on Auxiliary Map
by
Cai, Xiaoyu
, Chen, Ning
, Wang, Fei
, Yang, Tao
, Xing, Ruru
, Peng, Bo
in
Central business districts
/ Efficiency
/ Energy consumption
/ Linear programming
/ Literature reviews
/ Local transit
/ Public transportation
/ Roads & highways
/ Simulation
/ Simulation methods
/ Sustainability
/ Sustainable development
/ Sustainable urban development
/ Traffic assignment
/ Traffic congestion
/ Traffic control
/ Traffic flow
/ Transportation planning
2023
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
A Regional Road Network Capacity Estimation Model for Mountainous Cities Based on Auxiliary Map
by
Cai, Xiaoyu
, Chen, Ning
, Wang, Fei
, Yang, Tao
, Xing, Ruru
, Peng, Bo
in
Central business districts
/ Efficiency
/ Energy consumption
/ Linear programming
/ Literature reviews
/ Local transit
/ Public transportation
/ Roads & highways
/ Simulation
/ Simulation methods
/ Sustainability
/ Sustainable development
/ Sustainable urban development
/ Traffic assignment
/ Traffic congestion
/ Traffic control
/ Traffic flow
/ Transportation planning
2023
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
A Regional Road Network Capacity Estimation Model for Mountainous Cities Based on Auxiliary Map
Journal Article
A Regional Road Network Capacity Estimation Model for Mountainous Cities Based on Auxiliary Map
2023
Request Book From Autostore
and Choose the Collection Method
Overview
The focus of sustainable urban transportation development lies in realizing the untapped capacity potential of the existing road network and enhancing its operational efficiency without expanding its physical footprint. To quantify the supply capacity of road networks in mountainous cities, this paper converts the problem of solving the capacity of road networks into the problem of solving the minimum cut set in road networks from the perspective of road network capacity, using the idea of the auxiliary diagram method in graph theory. By improving the limitation that the auxiliary map method is only applicable to the single starting point and terminal point network, a regional road network capacity estimation model of a mountain city based on the auxiliary map is constructed. Combined with the actual regional road network, the model results presented in this paper show that the road network capacity calculated by the auxiliary graph method is 30,137 pcu/h. Using the improved traffic distribution simulation method, the network capacity is 38,776 pcu/h. Compared with the traffic distribution simulation method, the regional road network capacity model based on an auxiliary map proposed in this paper is more realistic.
Publisher
MDPI AG
Subject
This website uses cookies to ensure you get the best experience on our website.