Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
The Influence of the Wind Measurement Campaign Duration on a Measure-Correlate-Predict (MCP)-Based Wind Resource Assessment
by
Sauer, Ildo L.
, Fadigas, Eliane A.
, Miguel, José V. P.
in
Algorithms
/ Datasets
/ Electricity
/ Electricity distribution
/ Energy
/ long-term wind resource uncertainty
/ MCP methods
/ Methods
/ Short term
/ Turbines
/ Wind farms
/ wind measurement campaign
/ Wind power
/ wind resource assessment
2019
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
The Influence of the Wind Measurement Campaign Duration on a Measure-Correlate-Predict (MCP)-Based Wind Resource Assessment
by
Sauer, Ildo L.
, Fadigas, Eliane A.
, Miguel, José V. P.
in
Algorithms
/ Datasets
/ Electricity
/ Electricity distribution
/ Energy
/ long-term wind resource uncertainty
/ MCP methods
/ Methods
/ Short term
/ Turbines
/ Wind farms
/ wind measurement campaign
/ Wind power
/ wind resource assessment
2019
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
The Influence of the Wind Measurement Campaign Duration on a Measure-Correlate-Predict (MCP)-Based Wind Resource Assessment
by
Sauer, Ildo L.
, Fadigas, Eliane A.
, Miguel, José V. P.
in
Algorithms
/ Datasets
/ Electricity
/ Electricity distribution
/ Energy
/ long-term wind resource uncertainty
/ MCP methods
/ Methods
/ Short term
/ Turbines
/ Wind farms
/ wind measurement campaign
/ Wind power
/ wind resource assessment
2019
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
The Influence of the Wind Measurement Campaign Duration on a Measure-Correlate-Predict (MCP)-Based Wind Resource Assessment
Journal Article
The Influence of the Wind Measurement Campaign Duration on a Measure-Correlate-Predict (MCP)-Based Wind Resource Assessment
2019
Request Book From Autostore
and Choose the Collection Method
Overview
Driven by the energy auctions system, wind power in Brazil is undergoing a phase of expansion within its electric energy mix. Due to wind’s stochastic nature and variability, the wind measurement campaign duration of a wind farm project is required to last for a minimum of 36 months in order for it to partake in energy auctions. In this respect, the influence of such duration on a measure-correlate-predict (MCP) based wind resource assessment was studied to assess the accuracy of generation forecasts. For this purpose, three databases containing time series of wind speed belonging to a site were considered. Campaigns with durations varying from 2 to 6 years were simulated to evaluate the behavior of the uncertainty in the long-term wind resource and to analyze how it impacts a wind farm power output estimation. As the wind measurement campaign length is increased, the uncertainty in the long-term wind resource diminished, thereby reducing the overall uncertainty that pervades the wind power harnessing. Larger monitoring campaigns implied larger quantities of data, thus enabling a better assessment of wind speed variability within that target location. Consequently, the energy production estimation decreased, allowing an improvement in the accuracy of the energy generation prediction by not overestimating it, which could benefit the reliability of the Brazilian electric system.
Publisher
MDPI AG
This website uses cookies to ensure you get the best experience on our website.