Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Utilization of Excess Production of Waste-Fired CHP Plants for District Cooling Supply, an Effective Solution for a Serious Challenge
by
Arabkoohsar, Ahmad
, Fabricius, Mika
, Øland Tarp, Daniel
, Wehl Rasmussen, Thomas
in
Case studies
/ Cold
/ Design
/ district cooling
/ district heating
/ Electricity
/ Energy management
/ Feasibility studies
/ Flue gas
/ Heating
/ Load
/ MSW management
/ Power plants
/ Production capacity
/ techno-economic analysis
/ Thermal energy
/ waste incineration
2020
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Utilization of Excess Production of Waste-Fired CHP Plants for District Cooling Supply, an Effective Solution for a Serious Challenge
by
Arabkoohsar, Ahmad
, Fabricius, Mika
, Øland Tarp, Daniel
, Wehl Rasmussen, Thomas
in
Case studies
/ Cold
/ Design
/ district cooling
/ district heating
/ Electricity
/ Energy management
/ Feasibility studies
/ Flue gas
/ Heating
/ Load
/ MSW management
/ Power plants
/ Production capacity
/ techno-economic analysis
/ Thermal energy
/ waste incineration
2020
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Utilization of Excess Production of Waste-Fired CHP Plants for District Cooling Supply, an Effective Solution for a Serious Challenge
by
Arabkoohsar, Ahmad
, Fabricius, Mika
, Øland Tarp, Daniel
, Wehl Rasmussen, Thomas
in
Case studies
/ Cold
/ Design
/ district cooling
/ district heating
/ Electricity
/ Energy management
/ Feasibility studies
/ Flue gas
/ Heating
/ Load
/ MSW management
/ Power plants
/ Production capacity
/ techno-economic analysis
/ Thermal energy
/ waste incineration
2020
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Utilization of Excess Production of Waste-Fired CHP Plants for District Cooling Supply, an Effective Solution for a Serious Challenge
Journal Article
Utilization of Excess Production of Waste-Fired CHP Plants for District Cooling Supply, an Effective Solution for a Serious Challenge
2020
Request Book From Autostore
and Choose the Collection Method
Overview
District heating-connected waste incineration plants face a serious operating challenge during the warmer months of the year when the heating load is quite low. The challenge is the difficulty of managing the extra municipal solid waste to be disposed of, exposing great pressure and cost on the plant. Conventionally, the solution is either burning the surplus waste and providing the extra cooling required for the condenser with a summer chiller and paying the tax of the total heat generation of the plant, or paying other industries to burn the waste for their specific applications. Both of these solutions are, however, costly. In this study, to address this challenge the utilization of the extra available resources of waste incineration plants for district cooling supply is proposed. Then, the proposed solution is analyzed from the thermodynamic and economic points of view. The feasibility of the proposal is investigated for a real waste incineration plant in Denmark and its 50 neighboring office/service buildings as the case study. The simulations are done based on real hourly data of the plant and economic parameters. The results show that for the case study for a plant with a thermal capacity of 73 MW, a district cooling with a peak load of over 20 MW could be perfectly supplied. The payback period of the proposed solution, including the cost of piping, absorption chiller, etc., can be as short as five years.
Publisher
MDPI AG
Subject
This website uses cookies to ensure you get the best experience on our website.