MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel
Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel
Journal Article

Retrospective InSAR Analysis of East London during the Construction of the Lee Tunnel

2020
Request Book From Autostore and Choose the Collection Method
Overview
The Lee Tunnel was constructed as the first part of the Thames Tideway Improvement scheme, between 2010 and 2016. With tunnelling for the East section of the main Thames Tideway Tunnel, which joins the Lee Tunnel at Abbey Mills Pumping Station, beginning in early 2020, this paper investigates patterns of deformation in East London during construction of the Lee Tunnel. An unexpected geological feature, later identified as a drift filled hollow, was discovered during tunnelling. This study demonstrates that had eight years of ERS Persistent Scatterer Interferometry (PSI) data been analysed prior to tunnelling, the unusual pattern of displacement may have been recognised and further targeted borehole investigations taken place before the launch of the tunnel boring machine. Results also show how areas of different land use, including cemeteries and historic landfill, exhibit differences in settlement behaviour, compared with surrounding terraced housing. This research highlights the challenges in interpreting PSI results in an urban area with ongoing construction and the value of a long archive of data, which now spans almost three decades in London, that can be used to establish a baseline prior to construction.