An Optimization Model for Construction Stage and Zone Plans of Rockfill Dams Based on the Enhanced Whale Optimization Algorithm
by
Lv, Fei
, Zhao, Mengqi
, Zhang, Jun
, Zhong, Denghua
, Yu, Jia
in
construction stage and zone optimization
/ D-AHP
/ Dams
/ Decision making
/ Efficiency
/ enhanced whale optimization algorithm (EWOA)
/ flow shop construction
/ Genetic algorithms
/ Hydroelectric power
/ Neural networks
/ Optimization algorithms
/ Optimization techniques
/ Parameter estimation
/ Parameter identification
/ Photovoltaic cells
/ Production scheduling
/ rockfill dam
/ Simulation
2019
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
An Optimization Model for Construction Stage and Zone Plans of Rockfill Dams Based on the Enhanced Whale Optimization Algorithm
by
Lv, Fei
, Zhao, Mengqi
, Zhang, Jun
, Zhong, Denghua
, Yu, Jia
in
construction stage and zone optimization
/ D-AHP
/ Dams
/ Decision making
/ Efficiency
/ enhanced whale optimization algorithm (EWOA)
/ flow shop construction
/ Genetic algorithms
/ Hydroelectric power
/ Neural networks
/ Optimization algorithms
/ Optimization techniques
/ Parameter estimation
/ Parameter identification
/ Photovoltaic cells
/ Production scheduling
/ rockfill dam
/ Simulation
2019
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
An Optimization Model for Construction Stage and Zone Plans of Rockfill Dams Based on the Enhanced Whale Optimization Algorithm
by
Lv, Fei
, Zhao, Mengqi
, Zhang, Jun
, Zhong, Denghua
, Yu, Jia
in
construction stage and zone optimization
/ D-AHP
/ Dams
/ Decision making
/ Efficiency
/ enhanced whale optimization algorithm (EWOA)
/ flow shop construction
/ Genetic algorithms
/ Hydroelectric power
/ Neural networks
/ Optimization algorithms
/ Optimization techniques
/ Parameter estimation
/ Parameter identification
/ Photovoltaic cells
/ Production scheduling
/ rockfill dam
/ Simulation
2019
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
An Optimization Model for Construction Stage and Zone Plans of Rockfill Dams Based on the Enhanced Whale Optimization Algorithm
Journal Article
An Optimization Model for Construction Stage and Zone Plans of Rockfill Dams Based on the Enhanced Whale Optimization Algorithm
2019
Request Book From Autostore
and Choose the Collection Method
Overview
Rockfill dams are among the most complex, significant, and costly infrastructure projects of great national importance. A key issue in their design is the construction stage and zone optimization. However, a detailed flow shop construction scheme that considers the opinions of decision makers cannot be obtained using the current rock-fill dam construction stage and zone optimization methods, and the robustness and efficiency of existing construction stage and zone optimization approaches are not sufficient. This research presents a construction stage and zone optimization model based on a data-driven analytical hierarchy process extended by D numbers (D-AHP) and an enhanced whale optimization algorithm (EWOA). The flow shop construction scheme is optimized by presenting an automatic flow shop construction scheme multi-criteria decision making (MCDM) method, which integrates the data-driven D-AHP with an improved construction simulation of a high rockfill dam (CSHRD). The EWOA, which uses Levy flight to improve the robustness and efficiency of the whale optimization algorithm (WOA), is adopted for optimization. This proposed model is implemented to optimize the construction stages and zones while obtaining a preferable flow shop construction scheme. The effectiveness and advantages of the model are proven by an example of a large-scale rockfill dam.
Publisher
MDPI AG
This website uses cookies to ensure you get the best experience on our website.