MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing
Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing
Journal Article

Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing

2021
Request Book From Autostore and Choose the Collection Method
Overview
Flooding is one of the most destructive natural events that severely damage the ground and inundate underground infrastructure. Subway systems in metropolitan areas are susceptible to flooding, which may be exacerbated when land subsidence occurs. However, previous studies have focused on flood risk evaluation on regional/watershed-scales and land subsidence monitoring in plains, instead of on subway flood risk evaluation and how land subsidence aggravates the flood risk in subway systems. Using the proposed risk indicators and field survey data, we present a method assessing the flood risk of metropolitan subway systems under a subsidence condition based on the fuzzy analytic hierarchy process (FAHP) combined with a geographic information system (GIS). We use the regional risk level within the 500 m buffer zone of the subway line to depict the flood risk of the subway system. The proposed method was used to evaluate the flood risk of the Beijing subway system. The results show that the flood risks of the Beijing subway show a ring-like distribution pattern—risk levels decreasing from the central urban area to the suburbs. Very high and high risks are mainly located within third and fourth ring roads, accounting for 63.58% (29.40 km2) and 63.83% (81.19 km2) of the total area. Land subsidence exacerbated the Beijing subway system’s flood risk level—the moderate to very high risk increased by 46.88 km2 (16.33%), indicating that land subsidence is an essential factor affecting the flood risk level of subway systems. In addition to enhancing flood warnings, future subway flooding could be reduced by elevating the height of the stations’ exit (entrance) and installing water stop plates and watertight doors. This study is of great significance for flood warning and prevention in the Beijing subway system; it provides a theoretical basis for flood risk evaluation in other metropolitan areas.