Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
by
Goli, Alireza
, Han, Tao
, Erfan Babaee Tirkolaee
, Sangaiah, Arun Kumar
, Hematian, Milad
in
Classification
/ Completion time
/ Computer simulation
/ Genetic algorithms
/ Linear programming
/ Manpower
/ Multiple objective analysis
/ Nonlinear programming
/ Production scheduling
/ Project management
/ Renewable resources
/ Resource scheduling
/ Simulated annealing
/ Sorting algorithms
2019
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
by
Goli, Alireza
, Han, Tao
, Erfan Babaee Tirkolaee
, Sangaiah, Arun Kumar
, Hematian, Milad
in
Classification
/ Completion time
/ Computer simulation
/ Genetic algorithms
/ Linear programming
/ Manpower
/ Multiple objective analysis
/ Nonlinear programming
/ Production scheduling
/ Project management
/ Renewable resources
/ Resource scheduling
/ Simulated annealing
/ Sorting algorithms
2019
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
by
Goli, Alireza
, Han, Tao
, Erfan Babaee Tirkolaee
, Sangaiah, Arun Kumar
, Hematian, Milad
in
Classification
/ Completion time
/ Computer simulation
/ Genetic algorithms
/ Linear programming
/ Manpower
/ Multiple objective analysis
/ Nonlinear programming
/ Production scheduling
/ Project management
/ Renewable resources
/ Resource scheduling
/ Simulated annealing
/ Sorting algorithms
2019
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
Journal Article
Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
2019
Request Book From Autostore
and Choose the Collection Method
Overview
This study addresses the multi-objective multi-mode resource-constrained project scheduling problem with payment planning where the activities can be done through one of the possible modes and the objectives are to maximize the net present value and minimize the completion time concurrently. Moreover, renewable resources including manpower, machinery, and equipment as well as non-renewable ones such as consumable resources and budget are considered to make the model closer to the real-world. To this end, a non-linear programming model is proposed to formulate the problem based on the suggested assumptions. To validate the model, several random instances are designed and solved by GAMS-BARON solver applying the ε-constraint method. For the high NP-hardness of the problem, we develop two metaheuristics of non-dominated sorting genetic algorithm II and multi-objective simulated annealing algorithm to solve the problem. Finally, the performances of the proposed solution techniques are evaluated using some well-known efficient criteria.