MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia
Journal Article

Probability of Winning the Tender When Proposing Using BIM Strategy: A Case Study in Saudi Arabia

2021
Request Book From Autostore and Choose the Collection Method
Overview
The procurement process is one of the most important phases in any project life cycle, particularly when it comes to selecting the right contractor for the job. Awarding the contract to the best bid proposal is a critical step to ensure the greatest value. BIM has been recognized as not only a geometric modelling of buildings, but also, it facilitates the different stages in management of construction projects. The purpose of this paper is to study the impact of using Building Information Modeling (BIM) in the tendering process from the contractor’s perspective, based on a probability model able to predict winning probability, regardless of relative weight. The main objective of this research is to measure the likelihood of winning a tender in the case of implementing BIM strategy, compared with contractors who do not use BIM. The research uses a literature review, surveys, and interviews with experts to develop a model that predicts the probability of winning a contract; this is determined by measuring the BIM impact on each selection criterion in a multicriteria selection process using the Analytical Hierarchy Process (AHP) to develop a probability-based model. The results of the survey and the interview show that BIM strategy has a variant influence on the score the contractor could have on each of them raising the probability of winning the tender. The main result of this paper is the property-based model, which is able to predict BIM winning probability regardless of relative weight, which can be applied in any country. Nonetheless, the Saudi case study shows that utilizing BIM when proposing could increase the winning probability by up to 9.42% in the case of Quality-Based Selection (QBS), and to 5.5% in the case of Cost-Based Selection (CBS).