MbrlCatalogueTitleDetail

Do you wish to reserve the book?
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines
In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines
Journal Article

In-situ Low Power Tests of the ASDEX Upgrade ECRH Transmission Lines

2024
Request Book From Autostore and Choose the Collection Method
Overview
An Electron Cyclotron Resonance Heating (ECRH) system employing 8 gyrotrons is in routine operation at the ASDEX Upgrade tokamak at IPP Garching. The gyrotrons are of two-frequency type operating at 105 and 140 GHz with a maximum output power of up to 1 MW and 10 s pulse length. The gyrotron output beams are coupled to 8 waveguide transmission lines via quasi-optical Matching Optics Units (MOUs). The oversized corrugated HE11 waveguides with a diameter of 87 mm are operated at atmospheric pressure with overall lengths between 65 and 103 meters. The number of quasi-optical miter bends per line is between 6 and 8. High mode purity in the transmission lines is critical with respect to both, losses and atmospheric breakdowns in the waveguides. Beam measurements at low power have been performed along the transmission lines and are compared to high power measurements. Near-field calculations and measurements of mm-wave beams radiated from open-ended HE11 waveguides show, that varying intensity patterns determine the distribution of Ohmic loading in compact mm-wave beam launching antennas, where the first mirror is located in the reactive near-field or close to the Fresnel maximum.