MbrlCatalogueTitleDetail

Do you wish to reserve the book?
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
Journal Article

An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value

2022
Request Book From Autostore and Choose the Collection Method
Overview
This study involves a working limestone mine that supplies limestone to the cement factory. The two main goals of this paper are to (a) determine how long an operating mine can continue to provide the cement plant with the quality and quantity of materials it needs, and (b) explore the viability of combining some limestone from a nearby mine with the study mine limestone to meet the cement plant’s quality and quantity goals. These objectives are accomplished by figuring out the maximum net profit for the ultimate pit limit and production sequencing of the mining blocks. The issues were resolved using a branch-and-cut based sequential integer and mixed integer programming problem. The study mine can exclusively feed the cement plant for up to 15 years, according to the data. However, it was also noted that the addition of the limestone from the neighboring mine substantially increased the mine’s life (85 years). The findings also showed that, when compared with the production planning formulation that the company is now using, the proposed approach creates 10% more profit. The suggested method also aids in determining the desired desirable quality of the limestone that will be transported from the nearby mine throughout each production stage.