Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
by
Gonzalez Iglesias, D.
, Syratchev, I.
, Wuensch, W.
, Faus Golfe, A.
, Vnuchenko, A.
, Mcmonagle, G.
, Blanch, C.
, Gimeno, B.
, Catalan Lasheras, N.
, Boronat, M.
, Woolley, B.
, Esperante, D.
, Fuster, J.
in
Commissioning
/ Klystrons
/ Laboratories
/ Physics
/ Radio frequency
/ Superhigh frequencies
/ Test facilities
2018
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
by
Gonzalez Iglesias, D.
, Syratchev, I.
, Wuensch, W.
, Faus Golfe, A.
, Vnuchenko, A.
, Mcmonagle, G.
, Blanch, C.
, Gimeno, B.
, Catalan Lasheras, N.
, Boronat, M.
, Woolley, B.
, Esperante, D.
, Fuster, J.
in
Commissioning
/ Klystrons
/ Laboratories
/ Physics
/ Radio frequency
/ Superhigh frequencies
/ Test facilities
2018
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
by
Gonzalez Iglesias, D.
, Syratchev, I.
, Wuensch, W.
, Faus Golfe, A.
, Vnuchenko, A.
, Mcmonagle, G.
, Blanch, C.
, Gimeno, B.
, Catalan Lasheras, N.
, Boronat, M.
, Woolley, B.
, Esperante, D.
, Fuster, J.
in
Commissioning
/ Klystrons
/ Laboratories
/ Physics
/ Radio frequency
/ Superhigh frequencies
/ Test facilities
2018
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Journal Article
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
2018
Request Book From Autostore
and Choose the Collection Method
Overview
An S-band High-Gradient (HG) Radio Frequency (RF) laboratory is under construction and commissioning at IFIC. The purpose of the laboratory is to perform investigations of high-gradient phenomena and to develop normal-conducting RF technology, with special focus on RF systems for hadron-therapy. The layout of the facility is derived from the scheme of the Xbox-3 test facility at CERN [1] and uses medium peak-power (7.5 MW) and high repetition rate (400 Hz) klystrons, whose RF output is combined to drive two testing slots to the required power. The design and construction of the various components of the system started in 2016 and has been completed. The installation and commissioning of the laboratory is progressing, with first results expected before mid-2018. The technical characteristics of the different elements of the system and the commissioning status together with preliminary results are described.
Publisher
IOP Publishing
Subject
MBRLCatalogueRelatedBooks
Related Items
Related Items
We currently cannot retrieve any items related to this title. Kindly check back at a later time.
This website uses cookies to ensure you get the best experience on our website.