MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
Journal Article

Construction and commissioning of the S-Band high gradient RF laboratory at IFIC

2018
Request Book From Autostore and Choose the Collection Method
Overview
An S-band High-Gradient (HG) Radio Frequency (RF) laboratory is under construction and commissioning at IFIC. The purpose of the laboratory is to perform investigations of high-gradient phenomena and to develop normal-conducting RF technology, with special focus on RF systems for hadron-therapy. The layout of the facility is derived from the scheme of the Xbox-3 test facility at CERN [1] and uses medium peak-power (7.5 MW) and high repetition rate (400 Hz) klystrons, whose RF output is combined to drive two testing slots to the required power. The design and construction of the various components of the system started in 2016 and has been completed. The installation and commissioning of the laboratory is progressing, with first results expected before mid-2018. The technical characteristics of the different elements of the system and the commissioning status together with preliminary results are described.

MBRLCatalogueRelatedBooks