MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China
Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China
Journal Article

Groundwater environmental risk assessment of abandoned coal mine in each phase of the mine life cycle: a case study of Hongshan coal mine, North China

2020
Request Book From Autostore and Choose the Collection Method
Overview
Human activities during each phase of coal mine life cycle greatly affect groundwater environment. The groundwater environment destruction is not just only the destruction of underground structure but also the social problems caused by available groundwater resources reduction, as well as the environmental problems affecting ecosystem and human health. Moreover, the groundwater environmental risk of coal mining is complex, dynamic, and long-term. Therefore, a framework and quantitative method for groundwater environmental risk analysis at different phases of the mine life cycle was presented, which is composed of the groundwater system destruction risk (GSDR) and social-economic-ecological vulnerability (SEEV) assessment. The framework was applied in Hongshan abandoned coal mine, North China. Based on the aquifer structure destruction, groundwater flow field evolution, contamination, and social-economic influence analysis, 12 main controlling factors for the GSDR and 7 factors for the SEEV were determined and quantified separately. The results showed that the groundwater contamination of the Hongshan mine mainly occurred after closure, caused by the cross-strata pollution of mine water, which significantly reduced the groundwater available resources, which greatly affected local social-economy sustainable development and residents’ health. The Hongshan mine closure increased groundwater environmental risk, with the GSDR high-risk zone being 12.51 km 2 larger than that during the mining phase and the SEEV was calculated at a high level. This framework promotes systematic integration of the groundwater environmental risk assessment in mine life cycle.