MbrlCatalogueTitleDetail

Do you wish to reserve the book?
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
Journal Article

The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network

2023
Request Book From Autostore and Choose the Collection Method
Overview
In this paper, the capacitated lot-sizing and scheduling problem with sequence dependent setup times and costs in a closed loop supply chain is addressed. The system utilizes the closed-loop supply chain strategy so that the multi-class single-level products are produced through both manufacturing of raw materials and remanufacturing of returned recovered products. In this system, a single machine with a limited capacity in each time period is used to perform both the manufacturing and remanufacturing operations. The sequence-dependent setup times and costs (both between two lots of products of different classes and between two lots belonging to the same class of products produced through different methods) are considered. A large-bucket mixed integer programming formulation is proposed for the problem. This model minimizes not only the manufacturing and remanufacturing costs, the setup costs and the inventory holding and backlogging costs over the planning horizon, but also the energy costs paid for the utilization of machine and the compression of processing times. Since the problem is NP-hard, a matheuristic and a grey wolf optimization algorithm are proposed to solve it. To evaluate the efficiency of the proposed algorithm, some experimental instances are generated and solved. The obtained results show the effectiveness of the proposed algorithms.