Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Evaluating the Contractors Quality Control Practices on Construction Sites in Malaysia
by
Omran, AbdAlnaser
in
اعمال البناء
/ المقاولون
/ ماليزيا
/ مراقبة الجودة
/ معايير البناء
/ مواقع البناء
2016
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Evaluating the Contractors Quality Control Practices on Construction Sites in Malaysia
by
Omran, AbdAlnaser
in
اعمال البناء
/ المقاولون
/ ماليزيا
/ مراقبة الجودة
/ معايير البناء
/ مواقع البناء
2016
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Evaluating the Contractors Quality Control Practices on Construction Sites in Malaysia
Journal Article
Evaluating the Contractors Quality Control Practices on Construction Sites in Malaysia
2016
Request Book From Autostore
and Choose the Collection Method
Overview
Quality is the main factor that contributes for a better demand of a product. The higher quality product should gain more profit to its developer, and can be a high value asset in future. In order to achieve the requirement that satisfies the quality, quality control must be practiced widely in production stages. For construction work, all involved parties have their own responsibilities to make sure that the final products are built to achieve the quality demanded. The early stage involve a client and a consultant, which is prepared their own scope of work as planning, designing and taking care of the financial issue before handing over the working area to a contractor as a builder to commence the construction work. For a government own project, there is a standard called \"Standard Specification for Building Works in 2005\", which need to be fulfilled and obeyed by the entire project's contractor. This study focused on evaluating the quality control practices used by the contractors in having a smooth project and minimum non-conformance report issued for a construction sites in Malaysia.
Publisher
جامعة بنغازي - كلية الآداب والعلوم بالمرج
Subject
This website uses cookies to ensure you get the best experience on our website.