Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Evaluating turnaround time to improve clients' satisfaction in the tuberculosis reference laboratory in Douala
by
Hamada Beloko
, Teyim Pride Mbuh
, Anya Priscilla Amveilla
, Patricia Mendjime
, Mohamed Youssouf Mfouapon
, Bisso Ngono Annie Prudence
, Esso Linda
, Georges Alain Etoundi Mballa
, Valérie Flore Donkeng Donfack
2025
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Evaluating turnaround time to improve clients' satisfaction in the tuberculosis reference laboratory in Douala
by
Hamada Beloko
, Teyim Pride Mbuh
, Anya Priscilla Amveilla
, Patricia Mendjime
, Mohamed Youssouf Mfouapon
, Bisso Ngono Annie Prudence
, Esso Linda
, Georges Alain Etoundi Mballa
, Valérie Flore Donkeng Donfack
in
2025
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Evaluating turnaround time to improve clients' satisfaction in the tuberculosis reference laboratory in Douala
by
Hamada Beloko
, Teyim Pride Mbuh
, Anya Priscilla Amveilla
, Patricia Mendjime
, Mohamed Youssouf Mfouapon
, Bisso Ngono Annie Prudence
, Esso Linda
, Georges Alain Etoundi Mballa
, Valérie Flore Donkeng Donfack
2025
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Evaluating turnaround time to improve clients' satisfaction in the tuberculosis reference laboratory in Douala
Journal Article
Evaluating turnaround time to improve clients' satisfaction in the tuberculosis reference laboratory in Douala
2025
Request Book From Autostore
and Choose the Collection Method
Overview
IntroductionDelivery delays of laboratory results can result in death and/or economic loss to both the patient and the health system. Data is limited regarding turnaround time for tuberculosis testing in Cameroon. We evaluated intra- turnaround time in tuberculosis diagnosis, identified root causes, and brainstormed solutions to improve patient satisfaction.Materials and methodsIn this cross-sectional descriptive study, turnaround time for the pre-analytic phase was set at 3 hours, the analytic phase at 11 hours, and the post-analytic phase at 10 hours. The overall turnaround time was 24 hours. We used the Fishbone method of problem analysis involving the personnel of the Tuberculosis Reference Laboratory-Douala, to identify root causes. We brainstormed using the \"Whys\" causes of turnaround time failure during the process of tuberculosis diagnosis by GeneXpert MTB/RIF.ResultsWe analyzed samples from 526 clients. The median turnaround time was 45 (Range: 2-120) hours. A total of 216(41.1%) clients had a turnaround time failure. The turnaround time failures in the pre-analytic, analytic, and post-analytics phases were 64(29.6%), 128(59.3%), and 12(11.1%) respectively. Overall, 19 root causes of turnaround time failure were identified and grouped into six categories, namely: equipment, administration, technical-staff, environment, material, and method. Equipment maintenance (defective or non-calibrated modules) was the critical cause of turnaround time failures accounting for 86 (39.8%) of the overall turnaround time failure.Conclusionturnaround time in tuberculosis diagnosis is longer than expected, retarding patient care management. Focusing on equipment maintenance enhances the intra-laboratory testing process, thus improving overall patient satisfaction. The need for further studies to incorporate the extra-laboratory turnaround time in assessing the overall turnaround time is imperative.
Publisher
Public Library of Science (PLoS)
MBRLCatalogueRelatedBooks
Related Items
Related Items
We currently cannot retrieve any items related to this title. Kindly check back at a later time.
This website uses cookies to ensure you get the best experience on our website.