MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond
Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond
Trade Publication Article

Amarillo Welcomes Frank Baker to Lead the Mara Rosa Project Through Pre-Feasibility and Beyond

2010
Request Book From Autostore and Choose the Collection Method
Overview
Amarillo Gold Corp. is a company focused on the acquisition, definition and discovery of gold resources in Brazil. Its principal projects are the Mara Rosa project in the state of Goias and the Lavras do Sul project in the state of Rio Grande do Sul. The Posse Deposit at Mara Rosa contains 623,000 ounces indicated from 11.9MTonnes @ 1.62 g/t Au and 451,000 ounces inferred from 10.1MTonnes @ 1.38 g/t Au at a 0.5g/t cut-off grade, 43-101 compliant resource as independently determined by AEFS. The project is in the economic evaluation stage. The Posse deposit was successfully mined by WMC during the 1990's (mined areas are excluded from the above resource figures) and is located in an area of excellent infrastructure. It is located some 35 km NE of Yamana's Chapada open pit Cu-Au operation, 105 km NE of Serra Grande's underground Au mine, 105 km NNW of Anglo American's nickel laterite project (in construction), 95 km NW of Votarintim's Niquelandia nickel laterite mine and approximately 60 kms NE of Yamana's Pilar Au project (in feasibility). Grid power to the site was established during the previous open pit mining operation and the Serra da Mesa hydro-electric dam lies 35 km to the east.
Publisher
Intrado Digital Media Canada Inc