Search Results Heading

MBRLSearchResults

mbrl.module.common.modules.added.book.to.shelf
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
    Done
    Filters
    Reset
  • Discipline
      Discipline
      Clear All
      Discipline
  • Is Peer Reviewed
      Is Peer Reviewed
      Clear All
      Is Peer Reviewed
  • Item Type
      Item Type
      Clear All
      Item Type
  • Subject
      Subject
      Clear All
      Subject
  • Year
      Year
      Clear All
      From:
      -
      To:
  • More Filters
1 result(s) for "Tliba, Khalil"
Sort by:
Digital twin-driven dynamic scheduling of a hybrid flow shop
Industries require, nowadays, to be more adaptable to unforeseen real-time events as well as to the rapid evolution of their market (e.g. multiplication of customers, increasingly personalized and unpredictable demand, etc.). To meet these challenges, manufacturers need new solutions to update their production plan when a change in the production system or its environment occurs. In this context, our research work deals with a dynamic scheduling problem of a real Hybrid Flow Shop considering the specific constraints of a perfume manufacturing company. This paper proposes a Digital Twin-driven dynamic scheduling approach based on the combination of both optimization and simulation. For the optimization, we have developed a mixed integer linear programming (MILP) scheduling model taking into account the main specific scheduling requirements of our case study. Regarding the simulation approach, a 3D shop floor model has been developed including the additional stochastic aspects and constraints which are difficult or impossible to model with a MILP approach. These two models are connected with the real shop floor to create a digital twin (DT). The developed DT allows the re-scheduling of production according to internal and external events. Finally, validation scenarios on a perfume case study have been designed and implemented in order to demonstrate the feasibility and the relevance of the proposed digital twin-driven dynamic scheduling approach.