MbrlCatalogueTitleDetail

Do you wish to reserve the book?
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)
Journal Article

A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara–Sivas High-Speed Railway Project, Turkey)

2021
Request Book From Autostore and Choose the Collection Method
Overview
Throughout construction process of a tunnel in an active tectonic region, it may be impossible to avoid active faults. Active faults create two adverse effects on the tunnels which are sudden fault displacement and weak ground conditions in fault zone. If a tunnel crossed by an active fault, the tunnel might be damaged by sudden movement of the fault. However, the main goal is to localize this damage without complete loss of tunnel. In this study, a special design developed for a wide span tunnel cut by an active fault is presented and the performance of the design is verified by numerical analyses. T9 tunnel was constructed within the scope of Ankara–Sivas High-Speed Train Project, Turkey, and the special design at the intersection of T9 tunnel with the Akdagmadeni active fault is the main subject of this study. T9 tunnel predominantly passes through agglomerate, basalt, marble and gneiss units and the tunnel route crosses the Akdagmadeni fault at around Km: 327 + 915. At this location, major deformations occurred in the tunnel and the tunnel excavation had to stop for a certain period. After the re-design phase, a special tunnel support system for this location were developed and proposed design was analyzed with numerical analyses. In addition, the possible displacement of the Akdagmadeni fault was estimated and the inner lining was re-designed considering the seismic parameters (i.e. peak ground acceleration and maximum displacement during a large earthquake). Consequently, in the present study, the effects of active fault crossing on the tunnel were explained and a special inner lining design was proposed to localize the possible damages, which are originated from the sudden displacement of the active fault.