MbrlCatalogueTitleDetail

Do you wish to reserve the book?
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
Journal Article

A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study

2023
Request Book From Autostore and Choose the Collection Method
Overview
PurposeBuilding information modeling (BIM) is recognized as one of the technologies to upgrade the informatization level of the architecture engineering and construction (AEC) industry. However, the level of BIM implementation in the construction phase lags behind other phases of the project. Assessing the level of BIM implementation in the construction phase from a system dynamics (SD) perspective can comprehensively understand the interrelationship of factors in the BIM implementation system, thereby developing effective strategies to enhance BIM implementation during the construction phase. This study aims to develop a model to investigate the level of BIM implementation in the construction phase.Design/methodology/approachAn SD model which covered technical subsystem, organizational subsystem, economic subsystem and environmental subsystem was developed based on questionnaire survey data and literature review. Data from China were used for model validation and simulation.FindingsThe simulation results highlight that, in China, from 2021 to 2035, the ratio of BIM implementation in the construction phase will rise from 48.8% to 83.8%, BIM model quality will be improved from 27.6% to 77.2%. The values for variables “BIM platform”, “organizational structure of BIM” and “workflow of BIM” at 2035 will reach 65.6%, 72.9% and 72.8%, respectively. And the total benefits will reach 336.5 billion yuan in 2035. Furthermore, the findings reveal five factors to effectively promote the level of BIM implementation in the construction phase, including: policy support, number of BIM standards, owners demand for BIM, investment in BIM and strategic support for BIM.Originality/valueThis study provides beneficial insights to effectively enhance the implementation level of BIM in the construction phase. Meanwhile, the model developed in this study can be used to dynamically and quantitatively assess the changes in the level of BIM implementation caused by a measure.