MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Feasibility Study on the Applicability of Intelligent Well Completion
Feasibility Study on the Applicability of Intelligent Well Completion
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Feasibility Study on the Applicability of Intelligent Well Completion
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Feasibility Study on the Applicability of Intelligent Well Completion
Feasibility Study on the Applicability of Intelligent Well Completion

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Feasibility Study on the Applicability of Intelligent Well Completion
Feasibility Study on the Applicability of Intelligent Well Completion
Journal Article

Feasibility Study on the Applicability of Intelligent Well Completion

2024
Request Book From Autostore and Choose the Collection Method
Overview
The relevance of assessing the applicability of intelligent wells using autonomous inflow control devices lies in the active development of the relevant sector of the oil and gas industry and the limited understanding of the economic efficiency of intelligent wells. The use of autonomous inflow control devices allows for a change in the composition of flow to the well, thus contributing to delaying the breakthrough of undesirable formation fluids, but at the same time, such an effect affects the dynamics of formation fluid production, which undoubtedly has a huge impact on the economic effect of the project. The analysis of scientific publications on the topic of “intelligent well completion” as a downhole production monitoring and remote production control system has shown that the vast majority of researchers pay attention to the evaluation of technological efficiency, ignoring the economic aspects of the proposed solutions. This study considered the dependence of the economic effect on the geological reservoir and technological well characteristics for variant 1—intelligent horizontal well (HW) completion using autonomous inflow control devices and variant 2—conventional horizontal well completion using the open hole. Calculations of production levels and dynamics in the two variants were performed on a created sector hydrodynamic model of a horizontal well operating in the depletion mode. The analysis of the obtained results allowed us to determine the applicability criteria of the proposed configuration of formation and well characteristics at the object of study, as well as to establish general dependencies of the net discounted income of an intelligent well. As a result of this study, it was determined that the economic efficiency of intelligent well completion with the use of autonomous inflow control devices relative to conventional well completion increases with decreasing permeability and drawdown pressure on the reservoir and reaches maximum values at the object of study at the thickness of the oil-saturated part of the reservoir about 5–6 m and the location of the wellbore in it at 35–40% of the thickness of the oil-saturated part below the gas–oil contact (GOC). This article covers the research gap in evaluating the economic efficiency of intelligent HW completion using AICD relative to conventional HW completion in oil rims.