Research on the rework risk core tasks in prefabricated construction in China
by
Shen, Kaicheng
, Li, Xiaodong
, Zhihui, Zhang
, Cao, Xinying
in
Concurrent engineering
/ Construction industry
/ Construction management
/ Cost analysis
/ Costs
/ Energy consumption
/ Housing
/ Literature reviews
/ Manufacturing
/ Microprocessors
/ Optimization
/ Prefabricated buildings
/ Prefabrication
/ Productivity
/ Questionnaires
/ Risk management
2021
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Research on the rework risk core tasks in prefabricated construction in China
by
Shen, Kaicheng
, Li, Xiaodong
, Zhihui, Zhang
, Cao, Xinying
in
Concurrent engineering
/ Construction industry
/ Construction management
/ Cost analysis
/ Costs
/ Energy consumption
/ Housing
/ Literature reviews
/ Manufacturing
/ Microprocessors
/ Optimization
/ Prefabricated buildings
/ Prefabrication
/ Productivity
/ Questionnaires
/ Risk management
2021
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Research on the rework risk core tasks in prefabricated construction in China
by
Shen, Kaicheng
, Li, Xiaodong
, Zhihui, Zhang
, Cao, Xinying
in
Concurrent engineering
/ Construction industry
/ Construction management
/ Cost analysis
/ Costs
/ Energy consumption
/ Housing
/ Literature reviews
/ Manufacturing
/ Microprocessors
/ Optimization
/ Prefabricated buildings
/ Prefabrication
/ Productivity
/ Questionnaires
/ Risk management
2021
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Research on the rework risk core tasks in prefabricated construction in China
Journal Article
Research on the rework risk core tasks in prefabricated construction in China
2021
Request Book From Autostore
and Choose the Collection Method
Overview
PurposeThe purpose of this paper is to assess the process of prefabricated construction (PC) and analyze the impacts of rework risk to identify the core tasks for which the rework risk has severe impacts.Design/methodology/approachThe methods consist of a literature review, expert interviews, a questionnaire survey and a rework risk function. The expert interviews and questionnaire survey were administered to experts in the entire process of PC from the dimensions of rework frequency, rework cost and rework time. Descriptive and inferential statistics were employed to analyze the data. The rework risk function was based on the loss expectancy method.FindingsThere are 13 core tasks that have higher impacts than the average level. The core tasks in the design stage account for 100% of the tasks in the stage, those in the manufacturing stage account for 20% and those in the construction stage account for 23.1%. Compared with the other stages, the design stage is characterized by significantly more frequent rework, higher rework costs and longer rework time. The manufacturing stage is characterized by significantly higher rework costs than the construction stage. The manufacturing stage and construction stage are co-reliant, and both are impacted by the design stage.Practical implicationsThe findings provide stakeholders with a clear understanding of the core tasks of the PC process and represent a method for identifying core tasks. Stakeholders can learn from this to focus on the core tasks to reduce rework risk and manage the process with the priority of PC rework management based on the following order: design > manufacturing > construction. The approach is suitable for core task identification in other areas.Originality/valueThis research provides insight into rework risk management and provides a novel analysis method for rework risk and PC management from the perspective of the construction process. The findings are valuable for supporting stakeholders in making effective construction plans to reduce the impacts of rework risk in PC and provide a reference for future research on process optimization.