Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
by
Cao, Mingyang
, Wang, Zenian
, Zhang, Yonggang
, Li, Shuobiao
in
Bending moments
/ Constitutive models
/ Construction
/ Deformation
/ Displacement
/ Excavation
/ Mathematical models
/ Mechanical properties
/ Methods
/ Monitoring methods
/ Numerical methods
/ Pilot tunnels
/ Rock
/ Rock deformation
/ Rocks
/ Sequencing
/ Simulation
/ Trends
/ Tunnel construction
/ Tunnels
/ Unloading
2022
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
by
Cao, Mingyang
, Wang, Zenian
, Zhang, Yonggang
, Li, Shuobiao
in
Bending moments
/ Constitutive models
/ Construction
/ Deformation
/ Displacement
/ Excavation
/ Mathematical models
/ Mechanical properties
/ Methods
/ Monitoring methods
/ Numerical methods
/ Pilot tunnels
/ Rock
/ Rock deformation
/ Rocks
/ Sequencing
/ Simulation
/ Trends
/ Tunnel construction
/ Tunnels
/ Unloading
2022
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
by
Cao, Mingyang
, Wang, Zenian
, Zhang, Yonggang
, Li, Shuobiao
in
Bending moments
/ Constitutive models
/ Construction
/ Deformation
/ Displacement
/ Excavation
/ Mathematical models
/ Mechanical properties
/ Methods
/ Monitoring methods
/ Numerical methods
/ Pilot tunnels
/ Rock
/ Rock deformation
/ Rocks
/ Sequencing
/ Simulation
/ Trends
/ Tunnel construction
/ Tunnels
/ Unloading
2022
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
Journal Article
Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
2022
Request Book From Autostore
and Choose the Collection Method
Overview
Cross diaphragm (CRD) method divides the tunnel into multiple pilot tunnels to reduce the span of a single excavation, which is beneficial to reduce the disturbance of excavation construction to surrounding rocks. In this method, the excavation sequence of pilot tunnels is a key factor affecting the excavation disturbance. In this study, two schemes of excavation sequence of pilot tunnels were simulated by numerical method, based on a newly built shallow buried rectangular tunnel using CRD method. By comparing and analyzing the vertical displacements of tunnel surrounding rocks, ground surface settlements, crown settlements and bending moment of the primary support structure, the surrounding rock deformation characteristics and trends of the tunnel were revealed, which determined the more reasonable excavation sequence scheme for the construction of the rectangular tunnel. By comparing with the field monitoring data, the numerical simulation results were verified to a certain extent. In addition, the comparison of calculation results obtained from the Mohr–Coulomb (MC) and the hardening soil small (HSS) constitutive models were discussed. The investigation results show that: (1) the displacement of surrounding rock and bending moment of the primary support structure are closely related to the excavation sequence of the pilot tunnels; (2) the deformation trends revealed by the numerical results are similar to those from the field data; (3) according to the field construction process, the asymmetric excavation sequence of \"left upper pilot tunnel—left lower pilot tunnel—right-upper pilot tunnel—right lower pilot tunnel\" is safe and reliable for the rectangular tunnel construction.HighlightsTwo different excavation sequences of a rectangular tunnel with CRD method were systematically compared and analyzed, and the recommended excavation sequence was proposed.The displacement of surrounding rock and bending moment of primary support structure were closely related to the excavation sequences of pilot tunnels.The details of the excavation and construction process of a rectangular tunnel using CRD method were shown by pictures.Compared with the HSS model, the Mohr Coulomb (MC) model may lead to larger deformation in significant unloading / reloading problems.