Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups
by
Kim, Kyong Ju
, Kim, Deok Soo
, Kim, Kyoungmin
, Kim, Eu Wang
, Shin, Yeon Ju
in
Bids
/ Civil Engineering
/ Construction industry
/ Construction Management
/ Cost analysis
/ Cost estimates
/ Damage assessment
/ Damage detection
/ Data analysis
/ Decision making
/ Econometrics
/ Engineering
/ Estimation
/ Gas pipelines
/ Geotechnical Engineering & Applied Earth Sciences
/ Industrial Pollution Prevention
/ Pipeline construction
/ Project engineering
/ Rigging
/ 토목공학
2024
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups
by
Kim, Kyong Ju
, Kim, Deok Soo
, Kim, Kyoungmin
, Kim, Eu Wang
, Shin, Yeon Ju
in
Bids
/ Civil Engineering
/ Construction industry
/ Construction Management
/ Cost analysis
/ Cost estimates
/ Damage assessment
/ Damage detection
/ Data analysis
/ Decision making
/ Econometrics
/ Engineering
/ Estimation
/ Gas pipelines
/ Geotechnical Engineering & Applied Earth Sciences
/ Industrial Pollution Prevention
/ Pipeline construction
/ Project engineering
/ Rigging
/ 토목공학
2024
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups
by
Kim, Kyong Ju
, Kim, Deok Soo
, Kim, Kyoungmin
, Kim, Eu Wang
, Shin, Yeon Ju
in
Bids
/ Civil Engineering
/ Construction industry
/ Construction Management
/ Cost analysis
/ Cost estimates
/ Damage assessment
/ Damage detection
/ Data analysis
/ Decision making
/ Econometrics
/ Engineering
/ Estimation
/ Gas pipelines
/ Geotechnical Engineering & Applied Earth Sciences
/ Industrial Pollution Prevention
/ Pipeline construction
/ Project engineering
/ Rigging
/ 토목공학
2024
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups
Journal Article
Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups
2024
Request Book From Autostore
and Choose the Collection Method
Overview
Bid-rigging has long been a problem in the construction area. This research identified the existing problems in evaluating damages from bid-rigging in Design-Bid-Build (DBB) and lowest-bid construction projects. Traditional econometric assessment based on stochastics requires sufficient historical data to obtain reliable estimates. Thus, it is crucial to collect and analyze data from pertinent projects for its utilization. To ensure the accuracy of the estimation, a substantial amount of data on the outcomes of DBB bids should have been gathered. In many construction projects, that requirement could not be met. Furthermore, econometric analysis cannot reflect the differences caused by the details of individual projects. This study proposes an alternative approach based on detailed cost estimates, weights of major work groups and their historical bid rates when historical data from similar projects are scarce. This approach can reflect the distinct characteristics of individual projects. The proposed model was applied to 23 gas pipeline construction projects under DBB and the lowest bid. This study identified the impacts of the different compositions of major work groups. Bid rates of the main work groups could not only be used to evaluate the damages caused by bid-rigging, but could also be used to determine reliable bid prices and provide a bidding strategy to aid the bidder’s decision-making process in future bids for similar projects.