MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Adaptable design in Olympic construction
Adaptable design in Olympic construction
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Adaptable design in Olympic construction
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Adaptable design in Olympic construction
Adaptable design in Olympic construction

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Adaptable design in Olympic construction
Adaptable design in Olympic construction
Journal Article

Adaptable design in Olympic construction

2017
Request Book From Autostore and Choose the Collection Method
Overview
PurposeThe Olympic Games is the largest sporting mega event of its type, with deep cultural and historical roots. The event is short lived compared to the lifespan of the infrastructure required in host cities. The purpose of this paper is to examine models of adaptability in Olympic construction, using case studies in previous Olympic host cities of the Summer Olympic Games (Rome 1960, London 2012), to assess the impact of adaptability on future legacy.Design/methodology/approachA mixed methods approach (archival research, direct observation), was used in two case studies: Rome (Palazzetto dello Sport, Palazzo dello Sport), and London (London Olympic Velodrome, London Aquatics Centre). The case studies examined how adaptability was used in design to secure legacy.FindingsIn the selected case studies (Rome 1960, London 2012), adaptability has had a positive impact on the post-Games use of venues, all four of which remain in use today. However, there are multiple factors that contribute to post-Games legacy, and further research is necessary.Research limitations/implicationsWhilst some positive results were observed in this study, more research is necessary across a broader spectrum of sites and venues to make conclusive recommendations for architects designing for Mega Sporting events.Social implicationsThe significance of this study to architectural practice, academia, and society is its potential to benefit future Olympic Games, International Olympic Committee policy, and be extended to other Mega Sporting events.Originality/valueThe originality of this research lies within its analysis of Olympic infrastructures and sustainability, of which there is a current lack of comparative studies in academic research.