Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Hardware-in-the-Loop Validation of an Energy Management System for LV Distribution Networks with Renewable Energy Sources
by
Wędzik, Andrzej
, Szaniawski, Krzysztof
, Wasiak, Irena
, Mieński, Rozmysław
, Pawełek, Ryszard
, Kelm, Paweł
, Szypowski, Michał
in
Alternative energy sources
/ Communication
/ Computer simulation
/ Control algorithms
/ controller hardware-in-the-loop simulation
/ Controllers
/ Design
/ Distributed network protocols
/ DSOs
/ Electric vehicles
/ Embedded systems
/ Energy management
/ Energy resources
/ Energy storage
/ low-voltage networks
/ Network management systems
/ power hardware-in-the-loop simulation
/ R&D
/ Renewable resources
/ Research & development
/ testbed
/ testing and validation of controllers
2022
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Hardware-in-the-Loop Validation of an Energy Management System for LV Distribution Networks with Renewable Energy Sources
by
Wędzik, Andrzej
, Szaniawski, Krzysztof
, Wasiak, Irena
, Mieński, Rozmysław
, Pawełek, Ryszard
, Kelm, Paweł
, Szypowski, Michał
in
Alternative energy sources
/ Communication
/ Computer simulation
/ Control algorithms
/ controller hardware-in-the-loop simulation
/ Controllers
/ Design
/ Distributed network protocols
/ DSOs
/ Electric vehicles
/ Embedded systems
/ Energy management
/ Energy resources
/ Energy storage
/ low-voltage networks
/ Network management systems
/ power hardware-in-the-loop simulation
/ R&D
/ Renewable resources
/ Research & development
/ testbed
/ testing and validation of controllers
2022
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Hardware-in-the-Loop Validation of an Energy Management System for LV Distribution Networks with Renewable Energy Sources
by
Wędzik, Andrzej
, Szaniawski, Krzysztof
, Wasiak, Irena
, Mieński, Rozmysław
, Pawełek, Ryszard
, Kelm, Paweł
, Szypowski, Michał
in
Alternative energy sources
/ Communication
/ Computer simulation
/ Control algorithms
/ controller hardware-in-the-loop simulation
/ Controllers
/ Design
/ Distributed network protocols
/ DSOs
/ Electric vehicles
/ Embedded systems
/ Energy management
/ Energy resources
/ Energy storage
/ low-voltage networks
/ Network management systems
/ power hardware-in-the-loop simulation
/ R&D
/ Renewable resources
/ Research & development
/ testbed
/ testing and validation of controllers
2022
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Hardware-in-the-Loop Validation of an Energy Management System for LV Distribution Networks with Renewable Energy Sources
Journal Article
Hardware-in-the-Loop Validation of an Energy Management System for LV Distribution Networks with Renewable Energy Sources
2022
Request Book From Autostore
and Choose the Collection Method
Overview
This paper presents the use of real-time digital simulator (RTDS) and hardware-in-the-loop (HIL) methods for the validation of an energy management system designed for real low-voltage (LV) distribution networks with a high penetration of renewable energy sources. The system is used to address voltage violations and current overloading issues and allows the network operator to maintain safe and controllable network operations. The applied control strategy and the system software were verified by means of simulations. In this paper, the next stage of system validation using the HIL method is presented. A testbed was designed and developed to test the operation of prototype controllers of the system in flexible and reproducible conditions before installing them in the network. The presented testing platform not only includes the LV network simulator with the power amplifiers needed for closed-loop setup but also additional elements of a real network to which the system is dedicated, i.e., the advanced metering infrastructure, photovoltaic source, and energy storage inverters and load devices. Furthermore, the real cellular network of the distribution network operator is used in the communication between the controllers. In addition, the article contains discussions on communication issues, including limitations related to selected protocols. Finally, examples of the experimental validation of the controller prototypes are presented.
Publisher
MDPI AG
This website uses cookies to ensure you get the best experience on our website.