Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
by
Amer, Nabil H.
, Khalifa, Yasser A.
, Abdelbasset, Emad
, Hassan, Abbas
in
Construction industry
/ Contract terms
/ Crews
/ Earth and Environmental Science
/ Earth Sciences
/ Environmental Science and Engineering
/ Foundations
/ Genetic algorithms
/ Geoengineering
/ Geotechnical Engineering & Applied Earth Sciences
/ Hydraulics
/ Modules
/ Multiple objective analysis
/ Optimization models
/ Project engineering
/ Scheduling
/ Technical Paper
2023
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
by
Amer, Nabil H.
, Khalifa, Yasser A.
, Abdelbasset, Emad
, Hassan, Abbas
in
Construction industry
/ Contract terms
/ Crews
/ Earth and Environmental Science
/ Earth Sciences
/ Environmental Science and Engineering
/ Foundations
/ Genetic algorithms
/ Geoengineering
/ Geotechnical Engineering & Applied Earth Sciences
/ Hydraulics
/ Modules
/ Multiple objective analysis
/ Optimization models
/ Project engineering
/ Scheduling
/ Technical Paper
2023
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
by
Amer, Nabil H.
, Khalifa, Yasser A.
, Abdelbasset, Emad
, Hassan, Abbas
in
Construction industry
/ Contract terms
/ Crews
/ Earth and Environmental Science
/ Earth Sciences
/ Environmental Science and Engineering
/ Foundations
/ Genetic algorithms
/ Geoengineering
/ Geotechnical Engineering & Applied Earth Sciences
/ Hydraulics
/ Modules
/ Multiple objective analysis
/ Optimization models
/ Project engineering
/ Scheduling
/ Technical Paper
2023
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
Journal Article
Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
2023
Request Book From Autostore
and Choose the Collection Method
Overview
Scheduling repetitive construction projects poses a significant challenge in optimally utilizing multiple concurrent crews and sequencing their work to minimize project duration and cost. To address this challenge, this study presents the development of a multi-objective scheduling optimization model for repetitive construction projects consisting of three modules. First, a scheduling module ensures the harmonious coordination of multiple concurrent crews for each activity while considering varying productivity rates, work continuity constraints, and project precedence relationships. Second, a cost module incorporates various contractual cost components to enable a thorough evaluation of project costs and provides flexibility to contractors encountering different contract terms. Third, an optimization module utilizes a genetic algorithm to identify optimal combinations of crews working in parallel and their optimal work sequence, to simultaneously minimize project duration and cost. An application example from the literature was analyzed to validate the model and demonstrate its superiority over previous models. The results showed significant reductions of 8% and 0.78% in project duration and overall costs, respectively, compared to previous models. Furthermore, the capabilities of the model were demonstrated through a real-life case study involving a highway development and renovation project, highlighting its practical benefits and effectiveness in a real-world construction scenario.