Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
by
Eirgash, M. Azim
, Toğan, Vedat
in
Algorithms
/ Civil Engineering
/ Construction
/ Construction costs
/ Construction engineering
/ Construction industry
/ Construction Management
/ Critical path
/ Engineering
/ Geotechnical Engineering & Applied Earth Sciences
/ Industrial Pollution Prevention
/ Learning
/ Mathematical models
/ Multiple objective analysis
/ Optimization algorithms
/ Optimization models
/ Pareto optimization
/ Project engineering
/ Project management
/ Solutions
/ Technical literature
/ Tradeoffs
/ Weight
/ 토목공학
2019
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
by
Eirgash, M. Azim
, Toğan, Vedat
in
Algorithms
/ Civil Engineering
/ Construction
/ Construction costs
/ Construction engineering
/ Construction industry
/ Construction Management
/ Critical path
/ Engineering
/ Geotechnical Engineering & Applied Earth Sciences
/ Industrial Pollution Prevention
/ Learning
/ Mathematical models
/ Multiple objective analysis
/ Optimization algorithms
/ Optimization models
/ Pareto optimization
/ Project engineering
/ Project management
/ Solutions
/ Technical literature
/ Tradeoffs
/ Weight
/ 토목공학
2019
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
by
Eirgash, M. Azim
, Toğan, Vedat
in
Algorithms
/ Civil Engineering
/ Construction
/ Construction costs
/ Construction engineering
/ Construction industry
/ Construction Management
/ Critical path
/ Engineering
/ Geotechnical Engineering & Applied Earth Sciences
/ Industrial Pollution Prevention
/ Learning
/ Mathematical models
/ Multiple objective analysis
/ Optimization algorithms
/ Optimization models
/ Pareto optimization
/ Project engineering
/ Project management
/ Solutions
/ Technical literature
/ Tradeoffs
/ Weight
/ 토목공학
2019
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
Journal Article
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
2019
Request Book From Autostore
and Choose the Collection Method
Overview
Accelerating the project schedule raises the total cost of the project and shall be efficient only up to a certain limit. A Time-Cost Trade-off Problem (TCTP) is utilized to detect the optimal set of time-cost alternatives to enhance the overall construction project benefit. In this study, to find a set of Pareto front solutions, a multi-objective optimization model which is based on the Teaching- Learning Based Optimization (TLBO) incorporated with the Modified Adaptive Weight Approach (MAWA), is proposed. Four examples of construction projects taken from the technical literature ranging from 7 to 63 activities are investigated to show the performance of the MAWA-TLBO. The results are compared with those obtained using previously proposed models considering the optimal or near optimal solutions. It was found that the MAWA-TLBO algorithm works effectively for the TCTP in construction engineering and management field.