Jlab Chl1 2K Cold Box Replacement
by
Hasan, N
, Renzo, T
, Laverdure, N
, Butler, C
, MacDuffie, C
, Yang, S
, Brown, R
, Sprouse, R
, Creel, J
, Dixon, K
, Thompson, S
, Rath, D
, Norton, R
in
Cold
/ Compressors
/ Heat exchangers
/ Schedules
/ Support systems
2020
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Jlab Chl1 2K Cold Box Replacement
by
Hasan, N
, Renzo, T
, Laverdure, N
, Butler, C
, MacDuffie, C
, Yang, S
, Brown, R
, Sprouse, R
, Creel, J
, Dixon, K
, Thompson, S
, Rath, D
, Norton, R
in
Cold
/ Compressors
/ Heat exchangers
/ Schedules
/ Support systems
2020
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Journal Article
Jlab Chl1 2K Cold Box Replacement
2020
Request Book From Autostore
and Choose the Collection Method
Overview
A new sub-atmospheric cold box (SC1R), which hosts five technologically superior, water-cooled compressors and one similar 4K-2K refrigeration recovery heat exchanger, was proposed in July 2017, to replace the existing 2K cold box. The design of the new 2K cold box and the external support system have been completed. The project is in the fabrication and assembly phase, which will be completed at JLab. We present the design features, fabrication, installation and commissioning schedule for the new 2K cold box.