MbrlCatalogueTitleDetail

Do you wish to reserve the book?
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH
EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH
Journal Article

EFFECT OF BERTHING TIME AND BERTH OUTPUT ON CONVENTIONAL DONATION UTILIZATION AT PT PELINDO II PALEMBANG BRANCH

2019
Request Book From Autostore and Choose the Collection Method
Overview
Boombaru Port which is managed by PT Pelindo II Palembang Branch is a marine transportation infrastructure that plays an important role and function in the transportation wheel in the South Sumatra area. This is because this port is located in the city of Palembang as a center of government, trade and activitiestourism in South Sumatra. Based on data in 2017, the problem at this port is the high berthing time of ships at conventional docks, the realization of berth output is lower than the potential amount of cargo unloaded and loaded at conventional docks, and not achieving the target of conventional dock utilization. The purpose of this study is to find out and analyze how much influence berthing time, berth output together on the utilization of conventional docks. This research was conducted by collecting and processing data on ship and goods service performance and facilities and equipment utilization format reports in 2017. In this study it was found the average loading and unloading speed based on berthing time at conventional docks does not meet the loading discharge rate that has been determined based on the service level agreement. There is a difference in value between loading discharging rate with time and the loading discharging rate with working time . To optimize the utilization of conventional docks to match the predetermined RKA, streamlining the berthing time faster so that the output berth will also be optimized properly. To streamline berthing time and optimize berth output by accelerating loading and unloading activities at conventional docks by increasing the number of loading and unloading equipment at conventional docks such as jib cranes and head trucks. For the use of one jib crane / hour unit requires three head truck units. So for the addition of one jib crane unit also requires three head truck units. In order to support the loading and unloading activities at conventional docks and to avoid the high idle time at berthing time of the ship, care and maintenance of the loading and unloading equipment is needed so that the loading and unloading equipment can always be used.
Publisher
EconJournals
Subject