MbrlCatalogueTitleDetail

Do you wish to reserve the book?
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm
A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm
Paper

A Potential Second Shutoff from AT2018fyk: An updated Orbital Ephemeris of the Surviving Star under the Repeating Partial Tidal Disruption Event Paradigm

2024
Request Book From Autostore and Choose the Collection Method
Overview
The tidal disruption event (TDE) AT2018dyk/ASASSN-18UL showed a rapid dimming event 500 days after discovery, followed by a re-brightening roughly 700 days later. It has been hypothesized that this behavior results from a repeating partial TDE (rpTDE), such that prompt dimmings/shutoffs are coincident with the return of the star to pericenter and rebrightenings generated by the renewed supply of tidally stripped debris. This model predicted that the emission should shut off again around August of 2023. We report AT2018fyk's continued X-ray and UV monitoring, which shows an X-ray (UV) drop in flux by a factor of 10 (5) over a span of two months, starting 14 Aug 2023. This sudden change can be interpreted as the second emission shutoff, which 1) strengthens the rpTDE scenario for AT2018fyk, 2) allows us to constrain the orbital period to a more precise value of 1306\\(\\pm\\)47 days, and 3) establishes that X-ray and UV/optical emission track the fallback rate onto this SMBH -- an often-made assumption that otherwise lacks observational verification -- and therefore the UV/optical lightcurve is powered predominantly by processes tied to X-rays. The second cutoff implies that another rebrightening should happen between May-Aug 2025, and if the star survived the second encounter, a third shutoff is predicted to occur between Jan-July 2027. Finally, low-level accretion from the less bound debris tail (which is completely unbound/does not contribute to accretion in a non-repeating TDE) can result in a faint X-ray plateau that could be detectable until the next rebrightening.
Publisher
Cornell University Library, arXiv.org