MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China
Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China
Journal Article

Response of salt water intrusion to a huge navigation project construction in the Qinjiang River Estuary, Southeast China

2023
Request Book From Autostore and Choose the Collection Method
Overview
Salinity distribution depends strongly on estuary geometry, tidal amplitude, and freshwater discharge, which counteract salt intrusion. As an important part of the “New Western Land and Sea Corridor” in China, the Pinglu Canal Project (PCP) plan has been proposed to dredge a navigational channel from the Inland Qinjiang River to the Maowei Sea in South China Sea. Understanding the salinity transport process in estuary region is important for both water resource management and ecosystem health in the Qinjiang River Estuary (QRE). In this study, a predictive model of high-water slack was constructed based on the steady-state equation of salt intrusion, and the related measurable or quantifiable variables were considered through empirical relations. The developed model herein was applied to the QRE, and the predicted salt distribution appeared to agree well with the observations. Then, the response of fresh water discharge and tide on the process of salt intrusion in the QRE before and after the PCP construction was analyzed. The results indicate that when the water flow discharge is Q<100 m 3 /s, the saltwater intrusion length in the QRE during the high tide period can attach to 10–27 km after the channel deepening, increased by 4.5 km compared to the natural condition in a whole year, and the seawater will intrude to the Youth Ship Lock when the fresh water is Q<20 m 3 /s and tidal range is H 0 >2 m. During the dry period, the Youth Hydro-hub can alleviate the saltwater intrusion by increasing the water discharge when the tidal range is H 0 >2.0 m, and then decreasing the water discharge when the tidal range is H 0 <1 m. The predictive model herein can be used to estimate the salt intrusion length under variable fresh water and tide level in the QRE region and provide efficient suggestions for quantifying upstream water discharge to mitigate salt intrusion after PCP construction.