Study on Foundation Pit Construction Cost Prediction Based on the Stacked Denoising Autoencoder
by
Wu, Han
, Liu, Denghui
, Wang, Junwu
, Liu, Lanjun
in
Accuracy
/ Case studies
/ Construction contracts
/ Construction costs
/ Deep foundations
/ Engineering
/ Error analysis
/ Foundation construction
/ Genetic algorithms
/ Machine learning
/ Mathematical analysis
/ Mathematical problems
/ Neural networks
/ Noise reduction
/ Prediction models
/ Project management
/ Questionnaires
/ Regression analysis
/ Research methodology
/ Support vector machines
2020
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Study on Foundation Pit Construction Cost Prediction Based on the Stacked Denoising Autoencoder
by
Wu, Han
, Liu, Denghui
, Wang, Junwu
, Liu, Lanjun
in
Accuracy
/ Case studies
/ Construction contracts
/ Construction costs
/ Deep foundations
/ Engineering
/ Error analysis
/ Foundation construction
/ Genetic algorithms
/ Machine learning
/ Mathematical analysis
/ Mathematical problems
/ Neural networks
/ Noise reduction
/ Prediction models
/ Project management
/ Questionnaires
/ Regression analysis
/ Research methodology
/ Support vector machines
2020
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Study on Foundation Pit Construction Cost Prediction Based on the Stacked Denoising Autoencoder
by
Wu, Han
, Liu, Denghui
, Wang, Junwu
, Liu, Lanjun
in
Accuracy
/ Case studies
/ Construction contracts
/ Construction costs
/ Deep foundations
/ Engineering
/ Error analysis
/ Foundation construction
/ Genetic algorithms
/ Machine learning
/ Mathematical analysis
/ Mathematical problems
/ Neural networks
/ Noise reduction
/ Prediction models
/ Project management
/ Questionnaires
/ Regression analysis
/ Research methodology
/ Support vector machines
2020
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Study on Foundation Pit Construction Cost Prediction Based on the Stacked Denoising Autoencoder
Journal Article
Study on Foundation Pit Construction Cost Prediction Based on the Stacked Denoising Autoencoder
2020
Request Book From Autostore
and Choose the Collection Method
Overview
To accurately predict the construction costs of foundation pit projects, a model based on the stacked denoising autoencoder (SDAE) is constructed in this work. The influencing factors of foundation pit project construction costs are identified from the four attributes of construction cost management, namely, engineering, the environment, the market, and management. Combined with Chinese national standards and the practice of foundation pit project management, a method of the quantization of the influencing factors is presented. 60 deep foundation pit projects in China are selected to obtain 13 main characteristic factors affecting these project construction cost by using the rough set. Then, considering the advantages of the SDAE in dealing with complex nonlinear problems, a prediction model of foundation pit project construction costs is created. Finally, this paper employs these 60 projects for a case analysis. The case study demonstrates that, compared with the actual construction costs, the calculation error of the proposed method is less than 3%, and the average error is only 1.54%. In addition, three error analysis tools commonly used in machine learning (the determination coefficient, root mean square error, and mean absolute error) emphasize that the calculation accuracy of the proposed method is notably higher than those of other methods (Chinese national code, the multivariate return method, the BP algorithm, the BP model optimized by the genetic algorithm, the support vector machine, and the RBF model). The relevant research results of this paper provide a useful reference for the prediction of the construction costs of foundation pit projects.