MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger
Journal Article

Optimal Power Scheduling and Techno-Economic Analysis of a Residential Microgrid for a Remotely Located Area: A Case Study for the Sahara Desert of Niger

2023
Request Book From Autostore and Choose the Collection Method
Overview
The growing demand for electricity and the reconstruction of poor areas in Africa require an effective and reliable energy supply system. The construction of reliable, clean, and inexpensive microgrids, whether isolated or connected to the main grid, has great importance in solving energy supply problems in remote desert areas. It is a complex interaction between the level of reliability, economical operation, and reduced emissions. This paper investigates the establishment of an efficient and cost-effective microgrid in a remote area located in the Djado Plateau, which lies in the Sahara Ténéré desert in northeastern Niger. Three cases are presented and compared to find the best one in terms of low costs. In case 1, the residential area is supplied by PVs and a battery energy storage system (BESS), while in the second case, PVs, a BESS, and a diesel generator (DG) are utilized to supply the load. In the third case, the grid will take on load-feeding responsibilities alongside PVs, a BESS, and a DG (used only in scenario 1 during the 2 h grid outage). The central objective is to lower the cost of the proposed microgrid. Among the three cases, case 3, scenario 2 has the lowest LCC, but implementing it is difficult because of the nature of the site. The results show that case 2 is the best in terms of total life cycle cost (LCC) and no grid dependency, as the annual total LCC reaches about $2,362,997. In this second case, the LCC is 11.19% lower compared to the first case and 5.664% lower compared to the third case, scenario 1.