MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application
Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application
Journal Article

Integrated BIM and VR to implement IPD mode in transportation infrastructure projects: System design and case application

2021
Request Book From Autostore and Choose the Collection Method
Overview
The complex design of transportation infrastructure hinders communication between different roles in the project, which makes it difficult to promote the Integrated Project Delivery (IPD) mode. This paper discusses a design simulation and communication system based on Building Information Modeling and Virtual Reality for transportation infrastructure (DSC-BV-TI system), integrated with BIM, with VR developed by using a game engine. Based on an analysis of the user’s demand, the system introduces a three-dimensional BIM model of traffic infrastructure in an immersive VR environment and realizes the simulation design, weather simulation, virtual driving, sight distance calculation, visual simulation and other functions of traffic infrastructure project by using the system’s safety assessment and scheme decision. The system is applied to the design of the Jinjiazhuang Extra-Long Tunnel project of the Yan-Chong Expressway in Hebei Province, which was built for the 2022 Winter Olympics. The results show that, using the DSC-BV-TI system, the designer has completed a display of the overall scheme: the user can use the steering wheel to drive a vehicle; use the head-mounted display to play the picture; realize the simulation and interaction in a variety of simulated weather conditions and environments; and use IPD mode to communicate and make decisions on the design scheme of the traffic infrastructure, tunnel speed limit and other aspects that play a key role. The DSC-BV-TI system has 8 advantages and 4 disadvantages identified through a questionnaire survey, the advantages including high fidelity, high efficiency and low cost. At the same time, according to the research results, three suggestions to help improve the system are discussed. DSC-BV-TI system as a communication bridge between the design team and other stakeholders reduces the communication gap and promotes the implementation of the IPD mode in transportation infrastructure projects.